Count list for minute taking
Works left -> right. EVO meeting = 1: F2F meeting = 5 I've now added the last time minutes were taken in brackets.
IN: Duncan=10 Sam=10 Stephen=11 Chris=9 Kashif=11 Wahid=11 Pete=10 Daniela=12 (10.3.15) Andrew=10 Matt=11 David=11 Alessandra=11 Brian=11 Jeremy=12 Ewan=12 OUT: Mark=6 Minutes can be found at: UKI-ROC agenda
Action list
Note: I've started putting the new issues at the top. They are just more likely to be relevant, but I was too lazy to invert the whole table. Daniela
Action ID | Action description | Owner | Target date | Status | Date closed | Notes | ||
---|---|---|---|---|---|---|---|---|
O-150310-02 | Gather feedback on SL5 needs beyond December 2015 | Jeremy/David C | 10-04-2015 | Open | ||||
O-150310-01 | cgroups: Gareth to update wiki page with Glasgow config approach | Gareth | 10-04-2015 | Open | ||||
O-140303-08 | Follow up with SNO+ on https://ggus.eu/?mode=ticket_info&ticket_id=109694 | Gareth/Matt | 10-03-2014 | Open | ||||
O-140303-07 | create a DIRAC overview schematic and include information on the VM approach. | Tom | 10-04-2014 | In progress. | This can be found here. Comments welcome.
| |||
O-140303-06 | review Matt’s networking (perfSONAR) issues to Storage Group Meeting | Duncan | 11-03-2014 | Open | Only if they impact production work not if they are perfsonar only. | |||
O-140303-05 | Look into perfsonar dashboards. And data extraction meeting. | Jeremy | 10-05-2014 | In progress | Testing and evaluation of the pilot instances for esmond/maddash ongoing as psds.grid.iu.edu and psmad.grid.iu.edu. The production instance of the infrastructure monitoring is at psomd.grid.iu.edu. Data extraction meeting slides: https://indico.cern.ch/event/377034/material/slides/1.pdf (see slides 1 and 2 only).
| |||
O-140303-03 | check 'pap-admin lp' works and if not fix | All sites | 10-05-2014 | Open -> Closed ? | fix by updating argus | |||
O-140303-02 | Review Argo monitoring within UK NGI | David and Frederico | 10-05-2014 | Open |
| |||
O-140506-02 | Puppet config to make cvmfs changes once for all relevant VOs | Kashif | Open ? | Currently, when updating cvmfs information, it has to be done per VO rather than doing it once which then propagates as appropriate. CAN SOMEONE CHECK IF THIS HAS ACTUALLY BEEN DONE?
| ||||
0-140812-01 | RIPE probe deployment | Jeremy (?) | 2014-08-20 | In Progress | Discuss deployment of RIPE probes with sites at GridPP 33 -> Becomes (March 2015) chase the sites which still need to install RIPE probes that they were given at GridPP33. Sites remaining to install: ECDF
| |||
0-141216-02 | Tom, Jeremy, Lancaster lads | 2014-12-16 | Open | Engage with new northgrid VO members from UCLAN. |
See also: Operations Team Completed Actions and Operations Issues .