Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
Line 31: Line 31:
 
* [https://operations-portal.egi.eu/vapor_dev/resources/GL2ResSummary?NGI=NGI_UK&filter=site Request to check storage values in Vapor status board].
 
* [https://operations-portal.egi.eu/vapor_dev/resources/GL2ResSummary?NGI=NGI_UK&filter=site Request to check storage values in Vapor status board].
 
* The finalised T2 reliability & availability reports for January 2017 can be found at [https://espace.cern.ch/WLCG-document-repository/ReliabilityAvailability/2017/01-17/ in the wiki].
 
* The finalised T2 reliability & availability reports for January 2017 can be found at [https://espace.cern.ch/WLCG-document-repository/ReliabilityAvailability/2017/01-17/ in the wiki].
 +
* CERN AFS disconnection test - fallout and lessons learned.
  
  

Revision as of 11:39, 20 February 2017

Bulletin archive


Week commencing Monday 20th February 2017
Task Areas
General updates

Monday 20th February


Monday 13th February

Monday 6th February

  • There is a Benchmarking Working Group F2F in the pre-GDB slot this Tuesday. It covers experiment views (including benchmarking with production jobs), cloud benchmarking, issues with Haswell processors (magic boost investigation).
  • The GDB for February is this Wednesday. Topics include AFS phase-out, benchmarking, feedback on the EOS workshop and a baseline for WLCG T1 operations.
  • January R/A figures for the Tier-2 sites have been circulated:
    • ALICE. All OK
    • ATLAS
      • Sheffield 80%:82%
      • ECDF 87%:98%
      • RALPP 80%:80%
    • CMS. All OK
    • LHCb
      • Sheffield 71%:73%
      • ECDF 88%:100%
      • RALPP 83%:84%
    • Site responses so far:
      • RALPP reports that the load on their dCache is causing intermittent SAM failures.
      • Sheffield had an issue with ARGUS.
  • There was a short downtime to undertake updates of the GridPP website and the Vac websites on Friday 3rd February. No issues reported.
  • Cambridge/John: avoid frontier-squid-3.5.23-4.1
  • Winnie: Help to debug ARC-CE "This metric ... cannot be executed independently"
  • Minutes from the WLCG weekly ops meeting are available.
WLCG Operations Coordination - AgendasWiki Page

Monday 6th February

  • Minutes from the WLCG Data Steering Group meeting of 2nd February are available on the meeting agenda page.

Tuesday 31st January

  • There was a WLCG ops coordination meeting last Thursday 26th. Agenda | Minutes.
  • The next related meeting will be on 2nd February and this is the WLCG Data Steering Group. (Closed meeting).


Monday 16th January

  • The next WLCG ops coordination meeting is on 26th.
    • Downtimes proposal followup --> please send feedback by Jan 20;
    • Tape usage performance analysis.
Tier-1 - Status Page

Tuesday 14th February A reminder that there is a weekly Tier-1 experiment liaison meeting. Notes from the last meeting here

  • As reported last week the Castor 2.1.15 upgrade has been completed. However, there have been problems with CMS xroot redirection tests following this. The next change for Castor is to to update the SRMs.
  • The migration of LHCb data to the T10KD tape media has been completed. All Tier1 data is now on this media.
Storage & Data Management - Agendas/Minutes

Wednesday 15 Feb

  • Space tokens! Use them!
  • Leafed through interesting topics (technology permitting) from the CS3 workshop

Wednesday 08 Feb

  • More on accounting (again)

Wednesday 01 Feb

  • Accounting - need to revisit (again); KeyDocs need updating
  • Hardware - Simon's got a disk array to test drive

Wednesday 18 Jan

  • Continued ZFS discussion
  • Updates from the non-LHC VOs, data-wise. Mostly no news, except for DiRAC, Cambridge HPC and Edingburgh EPCC are debugging and testing; LSST expecting to do MC workflows end of Jan.


Tier-2 Evolution - GridPP JIRA

Tuesday 14 February 2017

  • Vac installed at Birmingham. Running LHCb production jobs. Preparing to run ALICE VMs.
  • ALICE VMs switched to using GSI proxies internally rather than host cert/keys.

Friday 3 February 2017

  • ATLAS MCORE VMs now successfully running PanDA production jobs.

Tuesday 31 January 2017

  • Vac 02.00 deployed at Liverpool and Manchester, and being used for installation underway at Birmingham.
  • ATLAS MCORE VMs in testing. Correctly fetch HTCondor jobs associated with MCOREVAC PanDA queues.
  • LHCb interruptible MC jobs in testing in VMs (and on LHCb HLT.) This will provide multiprocessor VMs that are flexible in duration and number of processors to fit available space.
  • Vcycle with OpenStack ID v3 support being used to manage LHCb tenancy at Yandex.ru, and in production at CERN, IN2P3-CC and Datacentred Ltd.

Thursday 5 January 2017

  • Vac 02.00 released, with SuperSlots mechanism for handling a mixture of different VM sizes on the same hypervisors.


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Monday 13th Febraury

  • Please check the keydocs page. Would all owners please review their pages and prepare a short note on how they will bring things up-to-date in the coming months. This will be discussed at a core ops meeting (poll to be circulated shortly).
  • There are several EGI operations document updates out for review. Please make comments to Jeremy by 20th Febraury for inclusion in the UK feedback:


Monday 30th January

The fusion VO has been removed from GridPP Approved VOs.

Monday 9th January

  • Tom put these together:
    • A snapshot of the GridPP UserGuide is now available as an offline document in the Zenodo repository:
    • ...and the v1.0 release of the LaTeX code used to compile it is here.
    • There are some minor differences (mainly hyperlink-related) to the online version [1], which has also had a v1.0 release here.


Tue 22nd Nov

  • More on Accounting audit tools

The process for ARC, Toque and VAC is now documented here.

https://github.com/gridpp/audit/wiki



General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas

Monday 13th February

  • There was an ops meeting on 13th February. Agenda
    • frontier-squid-3 in UMD 4.4.0 - changes to config
    • Assess IPv6 readiness:
      • Resource Centres: assess the IPv6 readiness of the site infrastructure (real machines, cloud managers)
      • NGIs/ROCs please start discussing with sites and provide suggestions for the overall plan
    • Decommissioning of dCache 2.10
    • Discussed stale ARGO results; being discussed with Product Teams.

Monday 16th January

  • There was an ops meeting on 9th January. Agenda.


Monday 7th November

  • There was an EGI Ops meeting today: agenda
  • UMD 3.14.5 released today
    • VOMS 3.5.0, which makes RFC proxies the default for voms-proxy-init
  • UMD 4.3.0 'October' release, release candidate ready, to be released by end of this week, including:
    • ARC, GFAL2, XROOT, Davix, dCache, ARGUS, Gridsite, edg-mkgrid, umd-release for CentOS7
  • please start using UMD4/SL6 or UMD4/CentOS7 instead of UMD3/SL6 & please don't use anymore EMI3
    • (think there may be a campaign around this soon)
  • Downtimes due to the vulnerability CVE-2016-5195: request an A/R recomputation
    • All the resource centres that were affected by the vulnerability CVE-2016-5195 and that declared a downtime between 2016-10-20 16:00 UTC and 2016-10-31 18:00 UTC are invited to request a recomputation of A/R figures for the days in which the downtime was ongoing.
Monitoring - Links MyWLCG

Monday 13th Febraury

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Monday 16th January

  • Rota to be updated this week. Gordon is on shift this week.

Monday 9th January

  • Daniela posted on 25th Dec to say: "there's quite a lot of tickets - I tried to extend them all into January.

Otherwise apparently the grid is still standing."


Monday 5th December

  • Another fairly quiet week. There were a few new tickets, which are mostly now resolved. There was an intermittent SRM alarm at RALPP which sporadically appeared then disappeared; it finally hung around long enough today to raise a ticket.


Rollout Status WLCG Baseline

Monday 13th February

  • Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
  • Does anyone want specific questions in this area tackled in a roundtable discussion?

Tuesday 7th December

  • Raul reports: validation of site BDII on Centos 7 done.

Tuesday 15th September

Tuesday 12th May

  • MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.


References


Security - Incident Procedure Policies Rota

Monday 20th February

  • Sites running Singularity must update as soon as possible.


Monday 13th Febraury

  • EGI-SVG-2017-12391 - Just a check (JC). Attacks on Hadoop installations - sites should check they are securely configured. [1]
  • Security team meeting this afternoon.

Monday 6th February

  • One security incident reported by EGI CSIRT labelled EGI-20170107-01. Not known to affect any UK site.
  • Closure report circulated for incident EGI-20161214-01. Not known to affect any UK site.
  • Advisory-SVG-CVE-2016-9587: Up to 'HIGH' risk input validation vulnerability concerning Ansible reported by EGI SVG [2](see also Bulletin report 17-Jan below)
  • Summary of last week's EUGridPMA meeting by David Groep here [3]


The EGI security dashboard.


Services - PerfSonar production dashboard |PerfSonar development dashboard | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Tuesday 14th February

  • The development dashboard is now operational again. However the production dashboard is not currently displaying latency results (OSG ticket submitted).
  • Birmingham pS host had lost its entire network connection and both Lancaster's hosts their IPv6 connection. Durham results are incomplete, GGUS ticket submitted (#126587).

Tuesday 25th October

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

Monday 13th February 2017, 16.00 GMT
25 Open UK Tickets this Week

ATLAS want your INPUT
126184 (26/1)
Atlas request for input on sites monitoring. In last week's cloud meeting Alastair asked if anyone had any input for this. If you do feel free to add to the google doc linked in the ticket or email your points to the cloud support mailing lists. In progress (7/2)

TOKEN AFFECTION
126554 (10/2)
Sno+ jobs failed at Liverpool, and once again John B had to educate a user group that space tokens are a thing (thanks John!). Would everyone who supports Sno+ be willing to roll out a space token for them? We don't know at this stage how much space would be needed, at this point it mainly seems for job stage back. In progress (13/2)

UNRELIABLE AVAILABILITY
126349 - ECDF
125743- RALPP

Both of these availability tickets are confusing the sites and myself (although the latter is still quite easy to do). ECDF are getting negative results again (and a lot of unknowns) and RALPP seem to be not updating results very often at all, suffering a several day lag by the looks of it.

Tools - MyEGI Nagios

29th November 2016

LSST monitoring is available through vo-nagios

https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail

13th September 2016


VOs - GridPP VOMS VO IDs Approved VO table
Site Updates

Tuesday 23rd February

  • For January:

ALICE: All okay.

RHUL 89%:89% Lancaster 0%:0%

RALPP: 80%::80%

RALPP: 77%:77%

  • Site responses:
    • RHUL: The largest problem was related to the SRM. The DPM version was upgraded and it took several weeks to get it working again (13 Jan onwards). Several short-lived occurrences of running out of space on the SRM for non-ATLAS VOs. For around 3 days (15-17 Jan) the site suffered from a DNS configuration error by their site network manager which removed their SRM from the DNS, causing external connections such as tests and transfers to fail. For one day (25 Jan) the site network was down for upgrade to the 10Gb link to JANET. Some unexpected problems occurred extending the interruption from an hour to a day. The link has been successfully commissioned.
    • Lancaster: The ASAP metric for Lancaster for January is 97.5 %. There is a particular problem with ATLAS SAM tests which doesn’t affect the site activity in production and analysis and this relates to the path name being too long. A re-calculation has been performed.
    • RALPP: Both CMS and LHCb low figures are due to specific CMS jobs overloading the site SRM head node. The jobs should have stopped now.



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A