Difference between revisions of "RAL Tier1 weekly operations castor 21/7/2017"
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not ...") |
(→Operation news) |
||
(4 intermediate revisions by one user not shown) | |||
Line 33: | Line 33: | ||
== Operation problems == | == Operation problems == | ||
+ | Blocking sessions in CMS Stager DB [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=191741 RT191741] | ||
+ | [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=191752 191752] | ||
+ | |||
+ | SAM test failures for CMS [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=191755 191755] | ||
== Operation news == | == Operation news == | ||
− | + | Firmware upgrade on the rest of OCF14 disk servers | |
== Plans for next week == | == Plans for next week == | ||
− | + | The Stack Clash patch on all Tier-1 CASTOR instances | |
== Long-term projects == | == Long-term projects == | ||
Line 55: | Line 59: | ||
Virtualise CASTOR headnodes; currently enquiring whether we move to VMware or HyperV | Virtualise CASTOR headnodes; currently enquiring whether we move to VMware or HyperV | ||
+ | |||
+ | Drain and decomission/recomission the 12 generation disk servers | ||
== Special actions == | == Special actions == | ||
Line 64: | Line 70: | ||
Ensure that Fabric is on track with the deployment of the new DB hardware | Ensure that Fabric is on track with the deployment of the new DB hardware | ||
− | |||
− | |||
RA to ensure that proper Nagios checks are in place for the xroot manager boxes | RA to ensure that proper Nagios checks are in place for the xroot manager boxes |
Latest revision as of 10:24, 28 July 2017
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. SL7 upgrade on tape servers 2. SL5 elimination from CASTOR functional test boxes and tape verification server 3. CASTOR stress test improvement 4. Generic CASTOR headnode setup 5. Virtualisation of the CASTOR headnodes
5. Special topics
1. OCF 14 firmware update
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Blocking sessions in CMS Stager DB RT191741 191752
SAM test failures for CMS 191755
Operation news
Firmware upgrade on the rest of OCF14 disk servers
Plans for next week
The Stack Clash patch on all Tier-1 CASTOR instances
Long-term projects
SL6 upgrade on functional test boxes and tape verification server: aquilon configuration is complete for the functional test box, all Nagios tests are in place and a creation of HyperV VM is undeway to replace the old box. The test for tape verification server is pending.
Tape-server migration to aquilon and SL7 upgrade
CASTOR stress test improvement
Configure multiple instances of a CASTOR generic headnode
Virtualise CASTOR headnodes; currently enquiring whether we move to VMware or HyperV
Drain and decomission/recomission the 12 generation disk servers
Special actions
Future CASTOR upgrade methodology: CERN need to provide RAL with a customed DB downgrade script for the on-the-fly CASTOR upgrade procedure
Actions
Ensure that Fabric is on track with the deployment of the new DB hardware
RA to ensure that proper Nagios checks are in place for the xroot manager boxes
GP to talk to AL about service ownership/handover of the xroot manager boxes
RA to continue nagging Martin to replace Facilities headnodes
Ensure that httpd on lcgcadm04 is up and running and the machine points to the right DB RT191377
Staffing
All in