Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(147 intermediate revisions by 14 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 11th February 2019
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 12th February'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* DPM release - 1.11
+
** https://indico.cern.ch/event/776832/
* Approved VOs: changes to BIOMED and ENMR
+
* DIRAC downtime this week due to the move to Slough - good luck!
* Simon:  VAC with VM condor VM to support local batch jobs?
+
* EGI Ops meeting this week.
* There is a GDB this week - [https://indico.cern.ch/event/739875/ agenda].
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
* NGI Argus/Central Banning config (see DC message).
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
* There was a WLCG ops meeting yesterday. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek190211 Minutes] are available.
+
** State of SRM usage at DPM sites?
  
  
 +
'''Tuesday 11th June'''
  
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Tuesday 5th February'''
 
* The EGI RP/RC A/R Report for January 2019 is [http://argo.egi.eu/lavoisier/site_reports?ngi=NGI_UK&report=Critical&accept=html available]. UKI overall fine. Bham and RAL-LCG2 may wish to examine their results.
 
* A reminder.... Please could everyone think about their WLCG (and beyond) engagements and commitments and put anything of note in the [https://www.gridpp.ac.uk/wiki/Engagements_and_commitments wiki table here].
 
* Notes from yesterday's WLCG ops meeting are [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek190204 available]. Issues at RAL noted by LHCb.
 
* It is CMS week this week.
 
* In case missed here is Elena's ATLAS update:
 
** https://ggus.eu/index.php?mode=ticket_info&ticket_id=138033: singularity jobs failing at RAL. A job that Alessandra submitted  still has a problem with the home directory. Ral is trying to fix it.
 
** There was  a power  lost to a rack and the two storage nodes in it in Lancaster over weekend which cause a problem to ATLAS jobs. This was fixed on Monday.
 
** Raul asked for srmless atlas transfers for Brunel. Elena is changing transfer configuration in AGIS but the jobs are still failing. Peter will look into this.
 
** There was a discussion on lightweight ATLAS Grid sites @ADC weekly last week.  Sheffield, Cambridge, Brunel, Durham, Bham and Sussex should become diskless sites.
 
* There is an ongoing discussion about LSST jobs on GridPP resources that may be of wider interest. Their VOMS was down so the question was raised about using GridPP VOMS or setting up another VOMS in the UK to read its data from the SLAC instance.
 
* The 9th DIRAC Users Workshop will be held in London 14. - 17. May 2019. Here is the [https://indico.cern.ch/event/756635/overview registration link].
 
* December's WLCG A/R final report is available at via [http://wlcg-docs.web.cern.ch/wlcg-docs/?dir=reporting/reliability-availability/2018/12-18 this link].
 
* The figures for January 2019 are now available and updates from 3 sites requested:
 
** [http://wlcg-sam.cern.ch/reports/2019/201901/wlcg/WLCG_All_Sites_ALICE_Jan2019.pdf ALICE]
 
** [http://wlcg-sam.cern.ch/reports/2019/201901/wlcg/WLCG_All_Sites_ATLAS_Jan2019.pdf ATLAS]
 
** [http://wlcg-sam.cern.ch/reports/2019/201901/wlcg/WLCG_All_Sites_CMS_Jan2019.pdf CMS]
 
** [http://wlcg-sam.cern.ch/reports/2019/201901/wlcg/WLCG_All_Sites_LHCB_Jan2019.pdf LHCb]
 
* Simon G asks: VAC with VM condor VM to support local batch jobs? Has anyone done it??
 
* EGI has started an HTCondor integration process and captures progress here: https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377.
 
* End of Support for CREAM-CE: The CREAM working group has announced that official support for the CREAM-CE component will cease at the end of the EOSC-hub project, i.e. in Dec 2020.  The CREAM working group will be providing full support until the end of 2019, including one minor release already scheduled. During 2020 only security updates will be released. 
 
 
'''Tuesday 29th January'''
 
* Site information for ATLAS Sites Jamboree
 
 
'''Tuesday 22nd January'''
 
* There was a GDB last week: [https://indico.cern.ch/event/739874/ Agenda].
 
* ATLAS would like to start a more forceful migration to CentOS7 and have the vast majority of resources, if not all, migrated by June 1. Please track your status [https://www.gridpp.ac.uk/wiki/Batch_system_status in our wiki].
 
* The latest from the WLCG ops meeting yesterday can be found [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek190121 here].
 
  
  
Line 84: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 +
'''Tuesday 11th June'''
 +
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
  
'''Monday 10th December'''
+
'''Tuesday 14th May'''
* WLCG ops coordination meeting held Thursday 6th. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes181206 minutes].
+
* Next meeting this Thursday.
** IPv6 deployment update
+
** CentOS / CC7 timelines for lxbatch and lxplus
+
** Container WG update
+
** CREAM CE end of support is Dec 2020
+
* Next meeting 7th February 2019.
+
  
'''Tuesday 4th December'''
+
'''Tuesday 9th April'''
* The next WLCG ops coordination meeting is this Thursday 6th. [https://indico.cern.ch/event/778285/ Agenda] | [ https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes181206 Minutes]. The focus will be on IPv6 status - so please ensure your site information is up-to-date.
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
  
'''Tuesday 30th October'''
 
* The ops meeting is shifting to the 8th November.
 
  
'''Tuesday 16th October'''
+
'''Tuesday 26th March'''
* There was an ops coordination meeting on 11th October: [https://indico.cern.ch/event/757611/ Agenda/slides] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes181011 Minutes].  
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* Next meeting is on 1st November.
+
* Next meeting booked for 4th April
  
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
  
'''Monday 8th October'''
 
* There will be an Ops Coordination meeting this Thursday 12th: [https://indico.cern.ch/event/757611/ Agenda].
 
  
'''Monday 17th September'''
 
* There was a WLCG ops coordination meeting last Thursday. The [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes180913 minutes] are now available and the presentations uploaded to [https://indico.cern.ch/event/756095/ this agenda page].
 
* Highlights:
 
** A report on EOS incidents, improvements and plans
 
** DPM Storage Resource Reporting deployment TF introduction
 
** CMS CRIC is deployed in production
 
** Sites should upgrade perfSONAR to v4.1 on CentOS 7
 
** The next meeting is planned for 11th October.
 
  
  
Line 134: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''12th February 2019''' Report for the Experiments Liaison Report (11/02/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-02-11 here].
+
 
 +
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
* Our tape robot experienced a 2 hour unscheduled outage on Wednesday. The issue was as the result of a failed network switch (internal to the robot), which was resolved after diligent use of the power switch.   
+
* Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issuePlan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
* CASTOR team are moving Alice to the new xrootd redirector setup.
+
 
* Garbage collection issues with the new wlcgTape that were, in part, responsible for issues experienced by NA62 last week have now been understood and subsequently resolved.
+
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
* The ARC-CE’s are intermittently reporting ‘unknown’ for SAM test results. We believe we understand the cause of this and upgrading to the current release version will resolve this issue.   
+
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production TeamAlthough this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
 
|}
 
|}
 +
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
Line 152: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20181205-minutes.txt Wed 05 Dec]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Rucio update - towards a recommended data management thing?
+
* DOME upgrade problems at Edinburgh
* IRIS needs a data lake? or distributed filesystem?
+
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
  
'''[http://storage.esc.rl.ac.uk/weekly/20181128-minutes.txt Wed 28 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
* Round table update!
+
* Storage support for IRIS VOs?
  
'''[http://storage.esc.rl.ac.uk/weekly/20181121-minutes.pdf Wed 21 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
* DPM sites: We are now not recommending not upgrading to DOME! unless you're using YAIM
+
* Report from yesterday's Rucio Face Meeting at Coseners
* More operational issues on IPv6 routed networks
+
* Suggestions for following up from yesterday's CEPH day hosted by CERN
  
'''[http://storage.esc.rl.ac.uk/weekly/20181114-minutes.pdf Wed 14 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
* Interesting operational issue switching ATLAS from SRM to xroot
+
* Storage related stuff at the FNAL (pre-)GDBs
* Do we have a "data management solution" and if so, what does it look like?
+
* DOME upgrade tickets for non-DOME DPM sites
  
'''[http://storage.esc.rl.ac.uk/weekly/20181107-minutes.pdf Wed 07 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
* More "data lake" and documentation
+
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
* Progress with caching but need to watch access patterns
+
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 186: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 14th January'''
+
'''Tuesday 30 Apr 2019'''
* Separate problems with LHCb and ATLAS VM definitions being investigated
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 240: Line 235:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
 +
''' Tue 9th July 2019'''
 +
 +
LHCb has added this to their requirements:
 +
 +
Sites not having an SRM installation must provide:
 +
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 +
''' Tue 16th April 2019'''
 +
 +
Minor change to LHCB requirements in Approved VOs:
 +
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
New VOMs rpms to match.
 +
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
'''Tuesday 12th Feb 2019'''
 
'''Tuesday 12th Feb 2019'''
 
Documentation done for HTCondor-CE apel accounting.
 
Documentation done for HTCondor-CE apel accounting.
Line 279: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
Tuesday 12th February
+
 
 +
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
 +
 
 +
''' Monday 11th March '''
 +
 
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.  
 
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.  
  
Line 393: Line 447:
  
 
===== =====
 
===== =====
 +
'''Tuesday 11th June
  
''' Tuesday 29th January'''
+
* NTR
 
+
* Current status
+
  
 
|}
 
|}
Line 416: Line 469:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 +
 +
'''Monday 5th March'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
  
 
'''Monday 10th September'''
 
'''Monday 10th September'''
Line 445: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12th February 2018, 10.15 GMT
 
 
41 Open Tickets today. A light touch today as you heard more then enough of my voice last week!
 
 
'''Will the new release of DPM (hrlp) fix these tickets?'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=139509 139509] - Brunel, CMS<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=139344 139344] - Brunel, CMS<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=139587 139587] - Lancaster, ATLAS<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=137996 137996] - Lancaster, ROD<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=131610 131610] - ECDF, Ipv6<br />
 
DPM 1.11 is out imminently, with a bunch of bug fixes that might sort these out. But a righteously grumpy Raul needed this fix a few weeks ago, and is dubious about DPM's testing infrastructure.
 
 
'''Could the following IPv6 tickets please get an update?'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=131609 131609] - Durham<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=131608 131608] - Sheffield<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=131607 131607] - Manchester<br />
 
 
<br>NGI Ticket regarding Birmingham'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=139506 139506] - I cheekily put a response in to the ticket as I thought the deadline was today. One thing I noticed - the new EOS instance doesn't appear to be in the gocdb (unless I'm being blind). Is this intentional?
 
  
 +
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A