|
|
Line 458: |
Line 458: |
| ===== ===== | | ===== ===== |
| <!-- ******************Edit start********************* -----> | | <!-- ******************Edit start********************* -----> |
− | '''Tuesday 18th July 2017, 10.00 BST'''
| |
| | | |
− | 34 Open UK Tickets this week. Last minute look at the tickets as I was off yesterday!
| |
− |
| |
− | '''Waiting for Reply from LHCB'''<br />
| |
− | [https://ggus.eu/?mode=ticket_info&ticket_id=124052 124052] - Glasgow Job-Publishing Ticket<br />
| |
− | [https://ggus.eu/?mode=ticket_info&ticket_id=129312 129312] - RALPP ARC CE Ticket<br />
| |
− | Both of these tickets are waiting for LHCB feedback.
| |
− |
| |
− | '''Atlas Multi-core Job Problems?'''<br />
| |
− | [https://ggus.eu/?mode=ticket_info&ticket_id=129054 129054] - Sheffield<br />
| |
− | [https://ggus.eu/?mode=ticket_info&ticket_id=129593 129593] - Oxford<br />
| |
− | Whilst the symptoms are a little different, could there be a link between these two atlas tickets?
| |
− |
| |
− | '''Storage Accounting Tickets'''<br />
| |
− | A quick note that all 6 of these tickets are chugging along nicely, with only the Liverpool figures still "under scrutiny". There's a plan involving keeping them open.
| |
| | | |
| <!-- ******************Edit stop********************* -----> | | <!-- ******************Edit stop********************* -----> |
General updates
|
Tuesday 17th July
- There was a pre-GDB on singularity https://indico.cern.ch/event/578972/
- There was a GDB on various topic.
- Notes from Monday's WLCG operations call are available here.
- EGI held an ops meeting yesterday.
- TB-SUPPORT topics
- Check on enabling LSST (not all sites were used in recent campaign).
Monday 10th July
- The EGI RP/RC A/R Report for June 2017 is available on the following link.
- GPU queues. We had a query on GridPP-Support about sites providing these queues and how to use them. Help requested.
Monday 3rd July
- July 2017 GDB and pre-GDB. Draft agenda available. Container technologies working group pre-GDB contact Gavin McCance to get involved.
- Winnie: Do sites need lcg-CA installed?
- EGI: Usage of ops VO. Is anyone still using it for UK tests?
- June T2 reports:
- The agenda of the WLCG ops meeting held on Monday is available.
Monday 26th June
- GOCDB has received a new service type request for: ‘eu.egi.storage.accounting’: - authorising the site/SE to publish the storage accounting data - making the site/SE appear in the portal - monitoring that the accounting data are regularly published.
- The registration to the next LHCOPN/LHCONE meeting is now open. LHCONE meeting agenda: https://indico.cern.ch/event/646629/.
- HEPiX Fall 2017 meeting will be held at KEK, Tsukuba, Japan, from 16th to 20th October. HEPiX registration page: http://hepix-fall-2017.kek.jp/registration.html.
- Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
- EGI: new nagios probes appdbsync and OCCI-Categories for testing cloud services
- Dan: cvmfs versions. It seems others are running 2.3 and 2.4 versions.
- LSST: submission from panda is now working at Lancs, Manc and RAL. The plan (only sketched for now) is to run a data challenge. GridPP is behind this and said we should give a high priority to this effort. At the moment the initial plan is to use 16,000 cores for a month. This is a significant chunk of resources and will require organisation and much testing to get it running smoothly. Though using panda LSST doesn't have all the resubmission features ATLAS has, they also use the storage tools slightly differently privileging xrootd which is not as well supported as gridftp.
|
WLCG Operations Coordination - AgendasWiki Page
|
Tuesday 18th July
- The next WLCG ops coordination meeting is planned for September 14th 2017.
Tuesday 11th July
- Agenda from Thursday's WLCG ops coordination meeting.
Tuesday 4th July
- There will be a WLCG ops coordination meeting this week on Thursday at 14:30 BST. Agenda. The theme is 'providing reliable storage'. Minutes will be available.
|
Tier-1 - Status Page
|
Tuesday 25th July
A reminder that there is a weekly Tier-1 experiment liaison meeting. Notes from the last meeting here
- The SOAP interface to the FTS3 service has been stopped on Monday 17th July. This will allow us to update FTS3 to the latest version.
- Castor unavailable during morning of 25th July for OS patching.
- EGI have announced withdrawal of support for the WMS at the end of 2017 (as announced elsewhere).
- A test Centos7 queue has been enabled on one of our CEs.
- A test gateway to Echo ceph-test-gw691.gridpp.rl.ac.uk) has been made dual stack and test transfers have been shown to work over IPv6 to/from CERN.
- Data is flowing from the Dirac Leicester site - reaching a peak transfer rate of around 1Gbit/sec.
|
Storage & Data Management - Agendas/Minutes
|
Wednesday 19 July
- Discussion of potential topics for data pre-GDB in September, without being able to commit yet
- Switching to fortnighly calls over the rest of July + August
Wednesday 12 July
- Lots of loose ends including Matt's IPv6 testing
Wednesday 05 July
- Continuing the WLCG workshop follow up, specifically looking at accounting and inforamtion publishing.
- On a related note, started looking at Swordfish again, more closely. Also provides REST-JSON API. Maybe we can do something Interesting(tm).
Wednesday 28 June
- Lots of good blog posts!
- Lots of good presentations and discussions at both hepsysman and the WLCG workshop. Even if we didn't finish all the things...
|
Tier-2 Evolution - GridPP JIRA
|
Tuesday 11 Jul
- Cambridge Vac site now in production for LHCb. ATLAS and GridPP being set up.
Tuesday 4 Jul
- Cambridge Vac site set up and being tested for LHCb.
- GridPP DIRAC VMs using Pilot 3.0 now running at UCL, Imperial, Liverpool, Manchester, Glasgow, Oxford.
|
Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06
|
Monday 16th January
- The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
Monday 14th November
- Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.
Monday 26th September
- A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
|
Documentation - KeyDocs
|
Tuesday 4th July
- A round of reminders is coming!
- Need to ensure decisions captured regarding supported other VOs.
Tue 23rd May
As part of the process of moving everything to Centos7 (or some other form of RHEL7), I've written up how we build nodes at Liverpool for our ARC/Condor system.
https://www.gridpp.ac.uk/wiki/Centos7_Adoption
I hope it's also a decent cheatsheet for Puppet3/Hiera. It's a draft, and I need to put in some more details, but it should be usable.
Tue 7th Mar
I want to get rid of following stale docs...
- Ten Easy Network Questions
- GridPP Answers to 10 Easy Network Questions
- SL5 status
- Glasgow Middleware Operations Logbook
- London Tier2 Shares
- 23rd June 2010 Special Topic: NGS Technical Roadmap - Pete Gronbech
- SAM availability: Monthly summary table
- Transfer Tests Birmingham Endpoints
- EVO Tips and Tricks
- BaBar: bbrbsub270
Monday 13th Feb
- Please check the keydocs page. Would all owners please review their pages and prepare a short note on how they will bring things up-to-date in the coming months. This will be discussed at a core ops meeting (poll to be circulated shortly).
- There are several EGI operations document updates out for review. Please make comments to Jeremy by 20th Febraury for inclusion in the UK feedback:
Monday 30th January
The fusion VO has been removed from GridPP Approved VOs.
Monday 9th January
- Tom put these together:
- A snapshot of the GridPP UserGuide is now available as an offline document in the Zenodo repository:
- ...and the v1.0 release of the LaTeX code used to compile it is here.
- There are some minor differences (mainly hyperlink-related) to the online version [1], which has also had a v1.0 release here.
Tue 22nd Nov
- More on Accounting audit tools
The process for ARC, Toque and VAC is now documented here.
https://github.com/gridpp/audit/wiki
General note
See the worst KeyDocs list for documents needing review now and the names of the responsible people.
|
Interoperation - EGI ops agendas
|
Tuesday 4th July
- There was an EGI OMB last Thursday. Agenda.
- Membership of the ops VO is being reduced.
Tuesday 16th May
- There was an EGI ops meeting yesterday. Agenda.
Tuesday 2nd May
Tuesday 21st March
|
Monitoring - Links MyWLCG
|
Tuesday 4th July
- There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.
Monday 13th February
- This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
Tuesday 1st December
Tuesday 16th June
- F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
- Feedback welcome.
|
On-duty - Dashboard ROD rota
|
6th June
- There are issues with the ARC CE tests again, so the ARC sites have not have any results in days and the corresponding availability tickets are going nowhere.
- New rota being compiled.
Tuesday 2nd May
- Generally quiet. A few low availability tickets.
|
Rollout Status WLCG Baseline
|
Monday 13th February
- Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
- Does anyone want specific questions in this area tackled in a roundtable discussion?
Tuesday 7th December
- Raul reports: validation of site BDII on Centos 7 done.
Tuesday 15th September
Tuesday 12th May
- MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
References
|
Security - Incident Procedure Policies Rota
|
Tuesday 18th July
- No advisories issued this week.
- GDB - WLCG Authz WG .PDF from GDB
- Requirements and strategy to deal with federated identities, VO-centric user suspension, EU GDPR data protection
- Everyone welcome at egroup
Tuesday 11th July
- EGI SVG Advisory [TLP:WHITE] 'HIGH' risk - Stack clash memory allocation vulnerability CVE-2017-1000364 [EGI-SVG-CVE-2017-1000364] [1]
- Update from Heads-Up of 21-June-17 - remains as HIGH risk.
- pre-GDB on Containers (mostly Singularity) this afternoon [2]
Tuesday 4th July
- No advisories issued this week.
- Expect an update for EGI-SVG-CVE-2017-1000364 - Stack Clash - likely to remain as HIGH risk
|
|
Services - PerfSonar production dashboard |PerfSonar development dashboard | GridPP VOMS
|
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
Tuesday 4th July
- Pete C is preparing another networking forward look document. Note that figures presented in the Manchester workshop were for a Tier-2 (not always a single site).
Tuesday 6th June
- An update from the DIRAC workshop? GridPP is still the only true multi-VO instance, so we will continue to see issues with this. release quality of dirac has improved within the past year. gfal2/EL7 problems seem to be coming to an end after being cooped up with all authors for 3 days on end. The Imperial GridPP module now has integrated testing. It was also noted that every dirac instance has it's own special module to adapt to their community on top of main dira. We are trying to push as much of out special functionality back into the main dirac branch.
Tuesday 25th April
- perfSONAR version 4 was released on 17th April. Sites with auto-update on should have been automatically upgraded. Note perfSONAR 4.0 requires more CPU than previous versions as a result of some of the increased functionality. Full details here
- Duncan has recreated the UK perfSONAR mesh. Link here!
|
|