General updates
|
Monday 30th January
Monday 23rd January
Monday 16th January
- December T2 A/R from WLCG:
- ALICE: All okay.
- ATLAS: Oxford: 73%:73% | RALPP: 80%:80%
- CMS: RALPP: 89%:89%
- LHCb: RALPP: 82%:82%
- Oxford will request recompute. RALPP affected by CMS SRM overloads and a delayed restart after new cert installed.
- The next WLCG workshop is in Manchester 19th-21st June.
- AM seeking non-LHC VO representatives (from the VOs and aware of their technical requirements) for 11th April pre-GDB.
- TB-Support: Matt D mentions "ZFS experiences and plans".
- EGI Conference 2017 will take place in Catania, Italy, between 9-12 May 2017.
- A summary of the networking pre-GDB last week can be found here.
|
WLCG Operations Coordination - AgendasWiki Page
|
Tuesday 31st January
- There was a WLCG ops coordination meeting last Thursday 26th. Agenda | Minutes.
- The next related meeting will be on 2nd February and this is the WLCG Data Steering Group. (Closed meeting).
Monday 16th January
- The next WLCG ops coordination meeting is on 26th.
- Downtimes proposal followup --> please send feedback by Jan 20;
- Tape usage performance analysis.
Monday 5th December
- There was a WLCG ops coordination meeting on 1st: Agenda | Minutes
Monday 7th November
|
Tier-1 - Status Page
|
Tuesday 31st January
A reminder that there is a weekly Tier-1 experiment liaison meeting. Notes from the last meeting here
- There were some problems following the Castor 2.1.15 update of the LHCb instance on the 18th. These problems were resolved by early evening the next day (19th). The Atlas instance upgrade took place successfully on the 24th. The GEN instance (ALICE plus non-LHC VOs) update happened on the 26th. There were some problems with the Alice SRM tests which were not fully resolved until Monday 30th. Castor CMS is being updated today (31st January).
- We are still seeing regular CMS SRM test failures - which are attributed to load on the CMS Castor instance.
- We now have load balancers in front of our Top-BDIIs as well as the Site-BDIIs.
|
Storage & Data Management - Agendas/Minutes
|
Wednesday 18 Jan
- Continued ZFS discussion
- Updates from the non-LHC VOs, data-wise. Mostly no news, except for DiRAC, Cambridge HPC and Edingburgh EPCC are debugging and testing; LSST expecting to do MC workflows end of Jan.
Wednesday 11 Jan
- ZFS presentation/discussion
Wednesday 04 Jan 2017
- Happy! Generally everything ticked along nicely over the break
- Interesting topics to pick up? Interest in ZFS again (see also Marcus's blog posts on the topic. GLUE2 for accounting?
Wednesday 21 Dec 2016
- Report from Computing Insights UK (nee MEW)
- Highlights and lowlights of the year (storage and data management only - which seems to have fared better than the world in general)
Wednesday 07 Dec
- Good GridPP presence at the CLOUD-SIG workshop at Crick last week. Real Work™ included GridFTP-endpoint-in-the-cloud and Jupyter notebooks. How do you get data into a Jupyter notebook (from the grid)?
- Opportunity to do more with data transfer between infrastructures.
|
Tier-2 Evolution - GridPP JIRA
|
Tuesday 31 January 2016
- Vac 02.00 deployed at Liverpool and Manchester, and being used for installation underway at Birmingham.
- ATLAS MCORE VMs in testing. Correctly fetch HTCondor jobs associated with MCOREVAC PanDA queues.
- LHCb interruptible MC jobs in testing in VMs (and on LHCb HLT.) This will provide multiprocessor VMs that are flexible in duration and number of processors to fit available space.
- Vcycle with OpenStack ID v3 support being used to manage LHCb tenancy at Yandex.ru, and in production at CERN, IN2P3-CC and Datacentred Ltd.
Thursday 5 January 2017
- Vac 02.00 released, with SuperSlots mechanism for handling a mixture of different VM sizes on the same hypervisors.
Monday 2 January 2017
Wednesday 14 December
- LHCb has added Vac resources to the LHCb_CRITICAL profile used in the SAM3 dashboard and WLCG site A&R reports. (GRIDPP-5)
Monday 12 December
- ALICE VMs in production at Manchester. Other Vac sites invited to install it. (No VOBOX required...)
|
Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06
|
Monday 16th January
- The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
Monday 14th November
- Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.
Monday 26th September
- A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
|
Interoperation - EGI ops agendas
|
Monday 16th January
- There was an ops meeting on 9th January. Agenda.
Monday 7th November
- There was an EGI Ops meeting today: agenda
- UMD 3.14.5 released today
- VOMS 3.5.0, which makes RFC proxies the default for voms-proxy-init
- UMD 4.3.0 'October' release, release candidate ready, to be released by end of this week, including:
- ARC, GFAL2, XROOT, Davix, dCache, ARGUS, Gridsite, edg-mkgrid, umd-release for CentOS7
- please start using UMD4/SL6 or UMD4/CentOS7 instead of UMD3/SL6 & please don't use anymore EMI3
- (think there may be a campaign around this soon)
- Downtimes due to the vulnerability CVE-2016-5195: request an A/R recomputation
- All the resource centres that were affected by the vulnerability CVE-2016-5195 and that declared a downtime between 2016-10-20 16:00 UTC and 2016-10-31 18:00 UTC are invited to request a recomputation of A/R figures for the days in which the downtime was ongoing.
- ARGO proposal to use GOCDB as the only source of topology information
- VAPOR 2.1 released in September, it replaces GSTAT
|
Monitoring - Links MyWLCG
|
Tuesday 1st December
Tuesday 16th June
- F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
- Feedback welcome.
Tuesday 31st March
Monday 7th December
|
On-duty - Dashboard ROD rota
|
Monday 16th January
- Rota to be updated this week. Gordon is on shift this week.
Monday 9th January
- Daniela posted on 25th Dec to say: "there's quite a lot of tickets - I tried to extend them all into January.
Otherwise apparently the grid is still standing."
Monday 5th December
- Another fairly quiet week. There were a few new tickets, which are mostly now resolved. There was an intermittent SRM alarm at RALPP which sporadically appeared then disappeared; it finally hung around long enough today to raise a ticket.
|
Rollout Status WLCG Baseline
|
Tuesday 7th December
- Raul reports: validation of site BDII on Centos 7 done.
Tuesday 15th September
Tuesday 12th May
- MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
References
|
Security - Incident Procedure Policies Rota
|
Monday 30th January
- One security incident reported by EGI CSIRT labelled EGI-20170107-01. Not known to affect any UK site.
- Closure report circulated for incident EGI-20161214-01. Not known to affect any UK site.
- Advisory-SVG-CVE-2016-9587: Up to 'HIGH' risk input validation vulnerability concerning Ansible reported by EGI SVG [1]
Tuesday 31st January
- Updated IGTF distribution 1.80 available for download [2]CHANGES
- EUGridPMA certificate authorities meeting this week [3]
- Communications challenge sent to 20 UK sites. 2 "failures" - no response within 4 hours. Thanks to all who participated.
Tuesday 24th January
- EGI SVG UPDATE advisory concerning availability of patches for 'HIGH' risk CVE-2016-7117 [4]
- EUGridPMA certificate authorities meeting next week [5]
Tuesday 17th January
- SL6 updates published for CVE-2016-7117 which was downgraded by EGI SVG to HIGH risk [6]
- Vulnerability disclosed for Ansible CVE-2016-9587. Upgrades are available. [7]
- 2016/01/16 - Incident report involving one non-UK site published by EGI CSIRT as EGI-20161229-01.
- EGI CSIRT F2F meeting this week.
The EGI security dashboard.
|
|
Services - PerfSonar production dashboard |PerfSonar development dashboard | GridPP VOMS
|
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
Tuesday 25th October
- Duncan has recreated the UK perfSONAR mesh. Link here!
Monday 19th September
- UK eScience CA - certificate issuance problems. Jens reported that on 15th a partial but significant database corruption occurred on the signing system for the CA. Data was restored from (offline) backups but the rebuild was not correctly configured.
- A large number of site admins and other GridPP supporters appeared to be suspended from the dteam VO last week. “During a planned upgrade operation of VOMS service, a system malfunction occurred. As a result, some users received false notification about membership expiration. We are in contact with the software development team in order to identify the cause.”
|
Site Updates
|
Tuesday 23rd February
ALICE:
All okay.
RHUL 89%:89%
Lancaster 0%:0%
RALPP: 80%::80%
RALPP: 77%:77%
- RHUL: The largest problem was related to the SRM. The DPM version was upgraded and it took several weeks to get it working again (13 Jan onwards). Several short-lived occurrences of running out of space on the SRM for non-ATLAS VOs. For around 3 days (15-17 Jan) the site suffered from a DNS configuration error by their site network manager which removed their SRM from the DNS, causing external connections such as tests and transfers to fail. For one day (25 Jan) the site network was down for upgrade to the 10Gb link to JANET. Some unexpected problems occurred extending the interruption from an hour to a day. The link has been successfully commissioned.
- Lancaster: The ASAP metric for Lancaster for January is 97.5 %. There is a particular problem with ATLAS SAM tests which doesn’t affect the site activity in production and analysis and this relates to the path name being too long. A re-calculation has been performed.
- RALPP: Both CMS and LHCb low figures are due to specific CMS jobs overloading the site SRM head node. The jobs should have stopped now.
|
|