Difference between revisions of "RAL Tier1 weekly operations castor 20/1/2017"
(→Long-term projects) |
(→Operation problems) |
||
Line 27: | Line 27: | ||
== Operation problems == | == Operation problems == | ||
+ | |||
+ | gdss772 failed and removed from production [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=185050 RT185050] | ||
Problems with the scheduling of transfers following 2.1.5 upgrade of LHCb [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=184998 RT184998] | Problems with the scheduling of transfers following 2.1.5 upgrade of LHCb [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=184998 RT184998] |
Revision as of 10:15, 25 January 2017
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Castor 2.1.15 2. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
gdss772 failed and removed from production RT185050
Problems with the scheduling of transfers following 2.1.5 upgrade of LHCb RT184998
Operation news
lhcb stager upgraded to 2.1.5
Increased number of threads for lhcb TM and memory DB has access to
Plans for next week
Security patch of lhcb on Mon
CASTOR 2.1.15 upgrade on ATLAS on Tue and on Gen on Thursday
Long-term projects
Tape-server migration to aquilon and SL7 upgrade
SRM 2.1.16 upgrade
Actions
Drain 10% of the 13 generation of disk servers (lhcbDst) for decommissioning
Add GP to the mail of CASTOR overwatch script
Staffing
RA on call next week