Count list for minute taking
Works top -> bottom. Vidyo meeting = 1: F2F meeting = 5 (count - last time minutes taken in brackets)
Minutes can be found at: Operations
Alessandra Forti (15 - 25.10.16)
Andy Washbrook
Andrew McNab (15 - 27.09.16)
Andrew Lahiff
Brian Davies (15 - 09.08.16)
Daniela Bauer (15 - 23.08.16)
Dan Traynor (14 - 28.6.16)
David Crooks (15 - 14.06.16)
Duncan Rand (16 - 15.11.2016)
Elena Korolkova
Gareth Roy (15 - 4.10.16)
Gordon Stewart
Govind Songara
Ian Loader
Jeremy Coles (15 - 12.01.16)
John Bland
John Hill
Kashif Mohammad (15 - 19.07.16)
Marcus Ebert
Matt Doidge (17 - 08.11.16)
Oliver Smith
Winnie Lacesso
Pete Gronbech (15 - 13.09.16)
Raul Lopes (14- 05.07.2016)
Raja Nandakumar
Robert Currie
Robert Frank
Steve Jones (17 - 18.10.16)
Sam Skipsey (15 - 31.05.16)
Terry Froy
Tom Whyntie
[About to be archived!
IN: Daniela=15 (23.08.16), Dan=14(28.6.16), Raul=14 (05.07.2016), Jeremy=15 (12.01.16), Sam=15 (31.05.16), David=15 (14.06.16), Duncan=16 (15.11.2016), Kashif=15 (19.07.16), Brian=15 (09.08.16), Pete=15 (13.09.16), AndrewM=15 (27.09.16), Stephen=17 (18.10.16),Gareth=15 (4.10.16), Alessandra=15 (25.10.16), MattD =17 (08.11.16)
OUT: Mark=6 Chris=9 Wahid=11 Ewan=13 ]
Action list
Please put the new issues at the top.
Action ID | Action description | Owner | Target date | Status | Date closed | Notes
|
---|---|---|---|---|---|---|
O-160524-02 | Look at the storage page on the GridPP wiki to see if it is up to date | Sam | 2016-06-30 | Open | (not high priority) | |
O-150327-02 | Put Northgrid VO and other regionals in VO Nagios project | Kashif, Alessandra | 27-06-2015 | on going (Kashif will try and ask (23/08/2016) | | |
O-160712-01 | Jeremy to investigate Indico options for uploading minutes. | Jeremy | Closed | Minutes can be pasted into the header or uploaded with CERN linked accounts. For those without any CERN link the minutes will (as before) need to be emailed to Jeremy | ||
O-160920-01 | Sites to review adding modeal VO. | All sites. | 04-10-16 | Open | Sites are asked to consider supporting moedal VO at Tom's request. Good opportunity to look at supporting cernatschool (or other VOs) too. https://operations-portal.egi.eu/vo/view/voname/vo.moedal.org
| |
O-160920-02 | Sam to liase with Kashif/Alastair regarding Oxford atlas "diskless site" testing. | Sam | 04-10-16 | Open | Self explanatory action! | |
O-161108-00 | Review VOs in Incubator page, in an attempt to make the process less sisyphean. | Many | 31-01-17 | Open | https://www.gridpp.ac.uk/wiki/GridPP_VO_Incubator - T2K should be added back to this list, Sno+ contact details should be changed to David Auty, SKA to be added to the list. All VOs should be double checked, contacts re-poked if necessary and possibly the status as a Incubator VO re-evaluated. The exceptions seems to be LZ - who are doing well. |