UK EMI2 Deployment

From GridPP Wiki
Revision as of 17:41, 14 February 2013 by Alessandra forti (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Current Deployment status

This page is meant to complement Daniela's "State of the Nation" and "EMI2 stage rollout" with dates and problems from the atlas point of view. Sites not in Atlas have been added to give a UK view too. Official EGI tickets can be followed here and here

  • Sites: Site name
  • CE/WN/Storage status: should have a date for the work starting, changed to "In progress" when the work starts and to "Done" when all CEs/WNs and Storage has been migrated.
  • WN Tested/In Production: should report the status of the EMI WNs in atlas have they been tested or have been set to production. To test the WNs you need to setup a queue with EMI-2 WNs behind and ask the cloud squad to put it into test. It can be aither an existing queue (less work), or a new queue which requires to create the resource in the atlas framework.
  • Problems: is a column to explain what the sites is waiting for or what technical problems are stopping the work.

Sites already on EMI-1 can put "Done". Although the emphasis is now to move glite3.2 services to EMI-2.
EMI-1/UMD-1 sites should be aware the support for this version will terminate on the 1 April 2013 though.

Sites running Atlas

Sites CE status WN status Storage status WN Tested WN In Production Tier Problems
RAL-LCG2 Done Done n/a yes yes T1
UKI-LT2-Brunel Done Done Done yes yes T3
UKI-LT2-IC-HEP Done Done n/a yes yes T3
UKI-LT2-QMUL Done Done Done yes yes T2
UKI-LT2-RHUL Done Done Head node done yes yes T2 Will do rolling upgrade of SL6 pool nodes
UKI-LT2-UCL-HEP Done Done Head node done yes yes T2 Will do rolling upgrade of SL6 pool nodes
UKI-NORTHGRID-LANCS-HEP Done Done Done yes yes T2
UKI-NORTHGRID-LIV-HEP Done Done Done (EMI2/SL6) yes yes T2
UKI-NORTHGRID-MAN-HEP Done Done Done (EMI2/SL6) yes yes T2
UKI-NORTHGRID-SHEF-HEP Done (EMI1) Done (EMI1) Done (EMI2,SL5) yes yes T2
UKI-SCOTGRID-DURHAM Done Done Done yes no T3
UKI-SCOTGRID-ECDF Done Done Done yes yes T2
UKI-SCOTGRID-GLASGOW Done (EMI1) Done Done (EMI1) yes yes T2
UKI-SOUTHGRID-BHAM-HEP Done (UMD1) Done Done yes yes T2
UKI-SOUTHGRID-CAM-HEP Done (EMI2) Done (EMI2) Done (EMI2) yes yes T2
UKI-SOUTHGRID-OX-HEP Done Done Done yes yes T2
UKI-SOUTHGRID-RALPP Done Done n/a yes yes T2
UKI-SOUTHGRID-SUSX Done Done Done yes yes T2

Sites not running Atlas

Sites CE date WN date Storage date WN Tested WN In Production Tier Problems
UKI-SOUTHGRID-BRIS-HEP Done(EMI2/SL5) Done(EMI2/SL5) Done(EMI2/SL6) yes yes not an atlas site Only 10% LCG site support
EFDA-JET Done Done Done n/a n/a not an atlas site