UKI-LT2-BRUNEL
Topic: HEPSPEC06
OS+cores,Bits | OS | Kernel | 32/64 | mem | gcc | Total | Per Core |
Dual CPU, Dual Core AMD Opteron(tm) Processor 265 | SL3.09 | 2.6.9-78.0.1.ELsmp | 32/32 | 4GB | 3.4.6 | 21.13 | 5.28 |
Dual CPU, Dual Core AMD Opteron(tm) Processor 265 | SL5.4 | 2.6.18-164.15.1.el5 | 64/64 | 4GB | 4.1.2 | 27.85 | 6.95 |
Dual CPU, Quad core Intel Xeon E5420 @ 2.50GHz | SL4.6 | 2.6.9-78.0.8.ELsmp | 64/64 | 16GB | 3.4.6 | 56.86 | 7.11 |
Dual CPU, Quad core Intel Xeon E5420 @ 2.50GHz | SL4.6 | 2.6.9-78.0.8.ELsmp | 32/64 | 16GB | 3.4.6 | 63.54 | 7.96 |
Dual CPU, Quad core Intel Xeon E5420 @ 2.50GHz | SL5.4 | 2.6.18-164.2.1.el5 | 64/64 | 16GB | 4.1.2 | 70.59 | 8.82 |
Topic: Middleware_transition
gLite3.1/SL4
I have the following services on glite 3.1
-> CEs dgc-grid-40, and dgc-grid-44
Soon to be replace by CreamCEs
-> CE dgc-grid-35
it should be decommissioned by the end of the year
-> BDII
to be upgraded in the next few months
-> SE dgc-grid-50
it has only 2% of the data at the site. I'm planning an upgrade for the
3rd week of December. Most of the data at Brunel is in dc2-grid-64,
glite 3.2 SE.
gLite3.2/EMI
ARGUS
. EMI Argus server running stable since May.
BDII_site
. Upgrading to glite 3.2 in October
CE (CREAM/LCG)
. dgc-grid-43 running on EMI CreamCE.
. Other CEs on LCG, but to be upgraded before the end of the year
glexec
. Deployed in dgc-grid-43
. To be deployed in all CEs when they are upgraded
SE
. Main SE (95%) of the storage running on SL5 DPM 1.8
. Remaining SE will be upgraded in December
UI
. SL5 glite 3.2
WN
. All glite 3.2
Comments
Topic: Protected_Site_networking
- This section intentionally left blank
Topic: Resiliency_and_Disaster_Planning
- This section intentionally left blank
Topic: SL4_Survey_August_2011
I have the following services on glite 3.1
-> CEs dgc-grid-40, and dgc-grid-44
Soon to be replace by CreamCEs
-> CE dgc-grid-35
it should be decommissioned by the end of the year
-> BDII
to be upgraded in the next few months
-> SE dgc-grid-50
it has only 2% of the data at the site. I'm planning an upgrade for the
3rd week of December. Most of the data at Brunel is in dc2-grid-64,
glite 3.2 SE.
Topic: Site_information
Memory
1. Real physical memory per job slot:
dgc-grid-35: 1G dgc-grid-40: 2G dgc-grid-44: 1G
2. Real memory limit beyond which a job is killed:
n/a
3. Virtual memory limit beyond which a job is killed:
n/a
4. Number of cores per WN:
dgc-grid-35: 2 dgc-grid-40: 8 dgc-grid-44: 4
Comments:
Network
1. WAN problems experienced in the last year:
Main connection capped at 400Mb/s
2. Problems/issues seen with site networking:
Recently, problems with site DNS servers. These have now been addressed.
3. Forward look:
Comments:
Network link expected to increase to 1GB in the next quarter
Move to a new data centre in April
Topic: Site_status_and_plans
25 March 2011
One CreamCE in Production.
SL5 WNs
All WNs on SL5. New worker nodes to be deployed in April.
SRM
Storage available to reach 560 TB by end o March.
SCAS/glexec
glexec to be deployed in the first week of April/2011.
CREAM CE
One CreamCE in production.
Planned deployment:
Replacing 3 lcg-CEs with CreamCEs.
One Argus server to be deployed in April.