Difference between revisions of "Tier1 Operations Report 2018-02-27"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(30 intermediate revisions by 2 users not shown)
Line 11: Line 11:
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 21st February 2018 to 28th February 2018
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Review of Issues during the week 21st February 2018 to 28th February 2018
 
|}
 
|}
* On Wednesday (21st) the IPv6 connections, both to the RAL Core network and the ‘bypass’ route will be moved to share the IPv4 connections. We have been running with separate, 10Gbit physical links for IPv6 as this would aid investigations of problems etc. However, the time has come to move the IPv6 onto the 40Gbit connections. This is being done ahead of a change to enable IPv6 (dual stack) on the Echo Gateways – i.e. providing IPv6 access to Echo.
+
* There is an outage on Castor announced for Thursday (1st March) while the database systems have Oracle patches applied.
 +
* The IPv6 connections, both to the RAL Core network and the 'bypass' route were successfully moved to share the IPv4 connections.This was done ahead of a change to enable IPv6 (dual stack) on the Echo Gateways which was enabled yesterday (27th).
 +
* AliceDisk is getting very full. Alice have been in informed and we continue to monitor.
 
<!-- ***********End Review of Issues during last week*********** ----->
 
<!-- ***********End Review of Issues during last week*********** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 23: Line 25:
 
|}
 
|}
 
* The problems with data flows through the site firewall being restricted is still present. New firewall kit has be purchased and delivered, awaiting deployment.
 
* The problems with data flows through the site firewall being restricted is still present. New firewall kit has be purchased and delivered, awaiting deployment.
 +
* Echo Gateway Dual Stack upgrade was implemented but appears to have broken RAL FTS.  Currently CERN FTS is being used as a stop-gap solution. This issues is on-going at time of writing.
 
<!-- ***********End Current operational status and issues*********** ----->
 
<!-- ***********End Current operational status and issues*********** ----->
 
<!-- *************************************************************** ----->
 
<!-- *************************************************************** ----->
Line 33: Line 36:
 
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Resolved Castor Disk Server Issues
 
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Resolved Castor Disk Server Issues
 
|}
 
|}
* None
+
* gdss776 (d1t0) - Back in production (RO)
 +
* gdss762 (d1t0) - Back in production (RO)
 
<!-- ***************************************************** ----->
 
<!-- ***************************************************** ----->
  
Line 65: Line 69:
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made since the last meeting.
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notable Changes made since the last meeting.
 
|}
 
|}
* Move to IPv6 connectivity - currently on 10Gbit links - to share the higher bandwidth (40Gbit) links used by IPv4. This has been approved at the CAB meeting (13/2/18), and will implemented on the 21/2/2018.
 
 
<!-- *************End Notable Changes made this last week************** ----->
 
<!-- *************End Notable Changes made this last week************** ----->
 
<!-- ****************************************************************** ----->
 
<!-- ****************************************************************** ----->
Line 87: Line 90:
 
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Declared in the GOC DB
 
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Declared in the GOC DB
 
|}
 
|}
* No downtime scheduled in the GOCDB between 2018-02-14 and 2018-02-21
+
{| border=1 align=center
 +
|- bgcolor="#7c8aaf"
 +
! Downtime ID
 +
! Hosts
 +
! Start time
 +
! End time
 +
! Severity
 +
! Description
 +
|-
 +
| align=center |24947
 +
| srm-biomed.gridpp.rl.ac.uk (SRM),srm-dteam.gridpp.rl.ac.uk (SRM), srm-cms.gridpp.rl.ac.uk (SRM),srm-atlas.gridpp.rl.ac.uk (SRM),srm-lhcb.gridpp.rl.ac.uk (SRM), srm-minos.gridpp.rl.ac.uk (SRM), srm-alice.gridpp.rl.ac.uk (SRM), srm-ilc.gridpp.rl.ac.uk (SRM), srm-mice.gridpp.rl.ac.uk (SRM), srm-t2k.gridpp.rl.ac.uk (SRM),srm-preprod.gridpp.rl.ac.uk (SRM), srm-cert.gridpp.rl.ac.uk (SRM), srm-na62.gridpp.rl.ac.uk (SRM), srm-snoplus.gridpp.rl.ac.uk (SRM), srm-lhcb.gridpp.rl.ac.uk (SRM.nearline), srm-cms-disk.gridpp.rl.ac.uk (SRM), srm-pheno.gridpp.rl.ac.uk (SRM), srm-solid.gridpp.rl.ac.uk (SRM)
 +
| 01/03/2018 11:00
 +
| 01/03/2018 17:00
 +
| SCHEDULED OUTAGE
 +
| Patching Castor Neptune and Pluto Primary Environments (GI+DB PSU + OJVM PSU OCT 2017)
 +
|}
 
<!-- **********************End GOC DB Entries************************** ----->
 
<!-- **********************End GOC DB Entries************************** ----->
 
<!-- ****************************************************************** ----->
 
<!-- ****************************************************************** ----->
Line 103: Line 121:
 
'''Listing by category:'''
 
'''Listing by category:'''
 
* Echo
 
* Echo
** Enable IPv6 (idual stack IPv4/6) on Echo gateways
+
** Applying minor CEPH update to fix the "backfill" bug. Increase number of placement groups and add more capacity.
 
* Castor:  
 
* Castor:  
 
** Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done)
 
** Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done)
Line 112: Line 130:
 
* Internal
 
* Internal
 
** DNS servers will be rolled out within the Tier1 network.
 
** DNS servers will be rolled out within the Tier1 network.
** Infrastructure
+
* Infrastructure
* Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed.
+
** Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed.
 
<!-- ***************End Advanced warning for other interventions*************** ----->
 
<!-- ***************End Advanced warning for other interventions*************** ----->
 
<!-- ************************************************************************** ----->
 
<!-- ************************************************************************** ----->
Line 171: Line 189:
 
| very urgent
 
| very urgent
 
| 21/12/2017
 
| 21/12/2017
| 31/01/2018
+
| 23/02/2018
 
| Local Batch System
 
| Local Batch System
 
| Killed pilots at RAL
 
| Killed pilots at RAL
 +
| WLCG
 +
|-
 +
| style="background-color: green;" | 133619
 +
| cms
 +
| in progress
 +
| top priority
 +
| 21/02/2018
 +
| 27/02/2018
 +
| CMS_Central Workflows
 +
| T1_UK_RAL Unmerged files missing
 +
| WLCG
 +
|-
 +
| style="background-color: green;" |133717
 +
| cms
 +
| in progress
 +
| very urgent
 +
| 27/02/2018
 +
| 27/02/2018
 +
| CMS_Data Transfers
 +
| RAL FTS3 Service: Significant Drop in Transfer Efficiency
 +
| WLCG
 +
|-
 +
| style="background-color: green;" |133719
 +
| atlas
 +
| in progress
 +
| urgent
 +
| 27/02/2018
 +
| 27/02/2018
 +
| File Transfer
 +
| Transfers to RAL-LCG2-ECHO failing
 
| WLCG
 
| WLCG
 
|}
 
|}
Line 188: Line 236:
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | GGUS Tickets Closed Last week
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | GGUS Tickets Closed Last week
 
|}
 
|}
{| border=1 align=center
+
* None
|- bgcolor="#7c8aaf"
+
! Request id
+
! Affected vo
+
! Status
+
! Priority
+
! Date of creation
+
! Last update
+
! Type of problem
+
! Subject
+
! Scope
+
|-
+
| 133265
+
| atlas
+
| closed
+
| top priority
+
| 04/02/2018
+
| 19/02/2018
+
| File Transfer
+
| Transfers to all UK, NL, and ND sites are failing with "No space left on device"
+
| WLCG
+
|-
+
| 133399
+
| atlas
+
| solved
+
| less urgent
+
| 09/02/2018
+
| 17/02/2018
+
| File Transfer
+
| Transfers to RAL-LCG2-ECHO fail with "Address already in use"
+
| WLCG
+
|-
+
| 133421
+
| snoplus.snolab.ca
+
| solved
+
| urgent
+
| 12/02/2018
+
| 20/02/2018
+
| File Transfer
+
| Failed Transfers since Friday 10:00
+
| EGI
+
|-
+
| 133475
+
| none
+
| solved
+
| urgent
+
| 14/02/2018
+
| 15/02/2018
+
| CMS_Data Transfers
+
| setup of /store/test/rucio
+
| WLCG
+
|}
+
 
<!-- **********************End Availability Report************************** ----->
 
<!-- **********************End Availability Report************************** ----->
 
<!-- *********************************************************************** ----->
 
<!-- *********************************************************************** ----->
Line 263: Line 260:
 
! Comment
 
! Comment
 
|-
 
|-
| 2018-02-15
+
| 2018-02-22
 
| 100
 
| 100
 
| 100
 
| 100
Line 272: Line 269:
 
|  
 
|  
 
|-
 
|-
| 2018-02-16
+
| 2018-02-23
 
| 100
 
| 100
 
| 100
 
| 100
Line 281: Line 278:
 
|  
 
|  
 
|-
 
|-
| 2018-02-17
+
| 2018-02-24
 
| 100
 
| 100
 
| 100
 
| 100
Line 290: Line 287:
 
|  
 
|  
 
|-
 
|-
| 2018-02-18
+
| 2018-02-25
 
| 100
 
| 100
 
| 100
 
| 100
Line 299: Line 296:
 
|  
 
|  
 
|-
 
|-
| 2018-02-19
+
| 2018-02-26
 
| 100
 
| 100
 
| 100
 
| 100
Line 308: Line 305:
 
|  
 
|  
 
|-
 
|-
| 2018-02-20
+
| 2018-02-27
 
| 100
 
| 100
 
| 100
 
| 100
Line 317: Line 314:
 
|  
 
|  
 
|-
 
|-
| 2018-02-21
+
| 2018-02-28
 
| 100
 
| 100
 
| 100
 
| 100
Line 339: Line 336:
 
! Day !! Atlas HC !! CMS HC !! Comment
 
! Day !! Atlas HC !! CMS HC !! Comment
 
|-
 
|-
| 2018/02/14 || style="background-color: yellow;" | 91 || 100||   
+
| 2018/02/21 || style="background-color: yellow;" | 95 || style="background-color: yellow;" | 99||   
 
|-
 
|-
| 2018/02/15 || style="background-color: yellow;" | 98 || style="background-color: yellow;" | 97||  
+
| 2018/02/22 || style="background-color: yellow;" | 98 || style="background-color: yellow;" | 99||  
 
|-
 
|-
| 2018/02/16 || style="background-color: yellow;" | 92 || style="background-color: yellow;" | 99||  
+
| 2018/02/23 || style="background-color: yellow;" | 97 ||style="background-color: yellow;" | 99||  
 
|-
 
|-
| 2018/02/17 || 100 || 99||  
+
| 2018/02/24 || 100 || style="background-color: yellow;" | 99||  
 
|-
 
|-
| 2018/02/18 || style="background-color: yellow;" | 94 || style="background-color: yellow;" | 98 ||  
+
| 2018/02/25 || style="background-color: yellow;" | 96 || style="background-color: yellow;" | 99||  
 
|-
 
|-
| 2018/02/19 || 100 || style="background-color: yellow;" | 99 ||  
+
| 2018/02/26 || 100 || 100 ||  
 
|-
 
|-
| 2018/02/20 || 100 || 100 ||
+
| 2018/02/27 || style="background-color: yellow;" | 95 || 100 ||
 
|}
 
|}
 
<!-- **********************End Hammercloud Test Report************************** ----->
 
<!-- **********************End Hammercloud Test Report************************** ----->
Line 361: Line 358:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
  
* CMS having issues with debug transfers (and only debug transfers),  Catalin to investigate?
 
 
|-
 
|-
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notes from Meeting.
 
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Notes from Meeting.
 
|}
 
|}

Latest revision as of 11:43, 28 February 2018

RAL Tier1 Operations Report for 28th February 2018

Review of Issues during the week 21st February 2018 to 28th February 2018
  • There is an outage on Castor announced for Thursday (1st March) while the database systems have Oracle patches applied.
  • The IPv6 connections, both to the RAL Core network and the 'bypass' route were successfully moved to share the IPv4 connections.This was done ahead of a change to enable IPv6 (dual stack) on the Echo Gateways which was enabled yesterday (27th).
  • AliceDisk is getting very full. Alice have been in informed and we continue to monitor.
Current operational status and issues
  • The problems with data flows through the site firewall being restricted is still present. New firewall kit has be purchased and delivered, awaiting deployment.
  • Echo Gateway Dual Stack upgrade was implemented but appears to have broken RAL FTS. Currently CERN FTS is being used as a stop-gap solution. This issues is on-going at time of writing.
Resolved Castor Disk Server Issues
  • gdss776 (d1t0) - Back in production (RO)
  • gdss762 (d1t0) - Back in production (RO)
Ongoing Castor Disk Server Issues
  • None
Limits on concurrent batch system jobs.
  • CMS Multicore 550
Notable Changes made since the last meeting.
Entries in GOC DB starting since the last report.
  • None
Declared in the GOC DB
Downtime ID Hosts Start time End time Severity Description
24947 srm-biomed.gridpp.rl.ac.uk (SRM),srm-dteam.gridpp.rl.ac.uk (SRM), srm-cms.gridpp.rl.ac.uk (SRM),srm-atlas.gridpp.rl.ac.uk (SRM),srm-lhcb.gridpp.rl.ac.uk (SRM), srm-minos.gridpp.rl.ac.uk (SRM), srm-alice.gridpp.rl.ac.uk (SRM), srm-ilc.gridpp.rl.ac.uk (SRM), srm-mice.gridpp.rl.ac.uk (SRM), srm-t2k.gridpp.rl.ac.uk (SRM),srm-preprod.gridpp.rl.ac.uk (SRM), srm-cert.gridpp.rl.ac.uk (SRM), srm-na62.gridpp.rl.ac.uk (SRM), srm-snoplus.gridpp.rl.ac.uk (SRM), srm-lhcb.gridpp.rl.ac.uk (SRM.nearline), srm-cms-disk.gridpp.rl.ac.uk (SRM), srm-pheno.gridpp.rl.ac.uk (SRM), srm-solid.gridpp.rl.ac.uk (SRM) 01/03/2018 11:00 01/03/2018 17:00 SCHEDULED OUTAGE Patching Castor Neptune and Pluto Primary Environments (GI+DB PSU + OJVM PSU OCT 2017)
Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.

Listing by category:

  • Echo
    • Applying minor CEPH update to fix the "backfill" bug. Increase number of placement groups and add more capacity.
  • Castor:
    • Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done)
    • Move to generic Castor headnodes.
  • Networking
    • Extend the number of services on the production network with IPv6 dual stack. (Done for Perfsonar, FTS3, all squids and the CVMFS Stratum-1 servers).
    • Replacement (upgrade) of RAL firewall.
  • Internal
    • DNS servers will be rolled out within the Tier1 network.
  • Infrastructure
    • Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed.
Open GGUS Tickets (Snapshot during morning of meeting)
Request id Affected vo Status Priority Date of creation Last update Type of problem Subject Scope
117683 none on hold less urgent 18/11/2015 03/01/2018 Information System CASTOR at RAL not publishing GLUE 2 EGI
124876 ops on hold less urgent 07/11/2016 13/11/2017 Operations [Rod Dashboard] Issue detected : hr.srce.GridFTP-Transfer-ops@gridftp.echo.stfc.ac.uk EGI
127597 cms on hold urgent 07/04/2017 29/01/2018 File Transfer Check networking and xrootd RAL-CERN performance EGI
132589 lhcb in progress very urgent 21/12/2017 23/02/2018 Local Batch System Killed pilots at RAL WLCG
133619 cms in progress top priority 21/02/2018 27/02/2018 CMS_Central Workflows T1_UK_RAL Unmerged files missing WLCG
133717 cms in progress very urgent 27/02/2018 27/02/2018 CMS_Data Transfers RAL FTS3 Service: Significant Drop in Transfer Efficiency WLCG
133719 atlas in progress urgent 27/02/2018 27/02/2018 File Transfer Transfers to RAL-LCG2-ECHO failing WLCG
GGUS Tickets Closed Last week
  • None
Availability Report
Day ALICE ATLAS ATLAS-ECHO CMS LHCb OPS Comment
2018-02-22 100 100 100 100 100 100
2018-02-23 100 100 100 100 100 100
2018-02-24 100 100 100 100 100 100
2018-02-25 100 100 100 100 100 100
2018-02-26 100 100 100 100 100 100
2018-02-27 100 100 100 100 100 100
2018-02-28 100 100 100 100 100 100
Hammercloud Test Report

Key: Atlas HC = Atlas HammerCloud (Queue RAL-LCG2_UCORE, Template 841); CMS HC = CMS HammerCloud

Day Atlas HC CMS HC Comment
2018/02/21 95 99
2018/02/22 98 99
2018/02/23 97 99
2018/02/24 100 99
2018/02/25 96 99
2018/02/26 100 100
2018/02/27 95 100
Notes from Meeting.