RAL Tier1 Operations Report for 7th February 2018

Review of Issues during the week 31st January 2018 to 7th February 2018
  • Atlas have moved their FTS transfers from our "test" FTS service to the Production one. This change was made (on 30th January) at our request and effectively consolidates us with a single production FTS service. However, there were problems over the weekend when disk space on the FTS servers ran out. Atlas submitted a GGUS alarm ticket on Sunday (4th Jan). The problem was resolved by the on-call team.
  • We have noticed disproportionately large numbers of Alice jobs running on the batch farm – blocking out other VOs. Steps have been taken to correct this.
  • Alice, CMS and LHCb VOBOXes are now dual stack IPv4/6.
  • The Hyper-K VO has been enabled on the batch farm.
  • We await further updates regarding an ongoing problem with one of the BMS (Building Management Systems) in the R89 machine room. This has an intermittent fault.
Current operational status and issues
  • The problems with data flows through the site firewall being restricted is still present. New firewall kit has be purchased and delivered, awaiting deployment.
Resolved Castor Disk Server Issues
  • gdss762 (atlasStripInput - D0T1) – Back in production RO
  • gdss761 (LHCbDst - D1T0) - Back in production RO
Ongoing Castor Disk Server Issues
  • None
Limits on concurrent batch system jobs.
  • CMS Multicore 550
  • ALICE jobs 750. (Attempt to re-balance farm)
Notable Changes made since the last meeting.
  • The Upgrade of Echo to the latest CEPH release (“Luminous”) was carried out successfully during the second half of last week. This was done as a rolling update with the service available throughout.
  • ALICE VOBOXes (lcgvo07 and lcgvo09) and LHCb VOBOX (lcgvo10) are now dual stack IPv4/6.
  • The Hyper-K VO has been enabled on the batch farm.
  • Atlas have moved their FTS transfers from our "test" FTS service to the Production one. This change was made at our request and effectively consolidates us with a single production FTS service.
Entries in GOC DB starting since the last report.
  • None
Declared in the GOC DB
  • None
Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.

Ongoing or Pending - but not yet formally announced:

  • Move IPv6 connectivity - currently on 10Gbit links - to share the higher bandwidth (40Gbit) links used by IPv4.

Listing by category:

  • Castor:
    • Update systems to use SL7 and configured by Quattor/Aquilon. (Tape servers done)
    • Move to generic Castor headnodes.
  • Networking
    • Extend the number of services on the production network with IPv6 dual stack. (Done for Perfsonar, FTS3, all squids and the CVMFS Stratum-1 servers).
    • Move IPv6 connectivity - currently on 10Gbit links - to share the higher bandwidth (40Gbit) links used by IPv4.
    • Replacement (upgrade) of RAL firewall.
  • Internal
    • DNS servers will be rolled out within the Tier1 network.
    • Infrastructure
  • Testing of power distribution boards in the R89 machine room is being scheduled for some time late July / Early August. The effect of this on our services is being discussed.
Open GGUS Tickets (Snapshot during morning of meeting)
Request id Affected vo Status Priority Date of creation Last update Type of problem Subject Scope
117683 none on hold less urgent 18/11/2015 03/01/2018 Information System CASTOR at RAL not publishing GLUE 2 EGI
124876 ops on hold less urgent 07/11/2016 13/11/2017 Operations [Rod Dashboard] Issue detected : hr.srce.GridFTP-Transfer-ops@gridftp.echo.stfc.ac.uk EGI
127597 cms on hold urgent 07/04/2017 29/01/2018 File Transfer Check networking and xrootd RAL-CERN performance EGI
132589 lhcb in progress very urgent 21/12/2017 31/01/2018 Local Batch System Killed pilots at RAL WLCG
GGUS Tickets Closed Last week
Request id Affected vo Status Priority Date of creation Last update Type of problem Subject Scope
111477 cms closed less urgent 29/01/2015 01/02/2018 CMS_Data Transfers RAL Staging Test for Run2 WLCG
112662 none closed top priority 25/03/2015 31/01/2018 Other This TEST ALARM has been raised for testing GGUS alarm work flow after a new GGUS release. EGI
133066 atlas verified top priority 26/01/2018 02/02/2018 File Transfer Unable to contact fts3-test.gridpp.rl.ac.uk WLCG
133139 ops verified less urgent 30/01/2018 01/02/2018 Operations [Rod Dashboard] Issue detected : org.nordugrid.ARC-CE-sw-csh-ops@arc-ce01.gridpp.rl.ac.uk EGI
133154 ops verified less urgent 31/01/2018 02/02/2018 Operations [Rod Dashboard] Issue detected : org.nordugrid.ARC-CE-sw-csh-ops@arc-ce02.gridpp.rl.ac.uk EGI
133196 none verified top priority 31/01/2018 05/02/2018 Other This TEST ALARM has been raised for testing GGUS alarm work flow after a new GGUS release. WLCG
133265 atlas solved top priority 04/02/2018 04/02/2018 File Transfer Transfers to all UK, NL, and ND sites are failing with "No space left on device" WLCG
Availability Report
Day ALICE ATLAS CMS LHCb OPS Comment
2018-02-01 100 100 100 100 100
2018-02-02 100 100 100 100 100
2018-02-03 100 100 98 100 100
2018-02-04 100 100 100 100 100
2018-02-05 100 100 100 100 100
2018-02-06 100 98 100 100 100
2018-02-07 100 100 100 100 100
Hammercloud Test Report

Key: Atlas HC = Atlas HammerCloud (Queue RAL-LCG2_UCORE, Template 841); CMS HC = CMS HammerCloud

Day Atlas HC CMS HC Comment
31/01/2018 98 98
1/02/2018 100 99
2/02/2018 100 98
3/02/2018 100 99
4/02/2018 100 98
5/02/2018 98 100
6/02/2018 100 99
Notes from Meeting.
  • It was noted that one morning this week Echo was delivering data to teh worker nodes at around 15GBytes/sec.
  • The MICE experiment is coming to an end. Future acess to MICE data was briefly discussed.
  • It was noted that there are plans to connect the RAL network to JANET at 100Gbit.