Line 83: Line 83:
 
<!-- ******* still to be formally scheduled and/or announced ******* ----->
 
<!-- ******* still to be formally scheduled and/or announced ******* ----->
 
'''Listing by category:'''
 
'''Listing by category:'''
 +
* Replace the UKLight Router including upgrading the 'bypass' link to the RAL border routers to 40Gbit. Being scheduled for Wednesday 5th October.
 
* Intervention on Tape Libraries - early November.
 
* Intervention on Tape Libraries - early November.
 
'''Listing by category:'''
 
'''Listing by category:'''
Line 90: Line 91:
 
** Migration of LHCb data from T10KC to T10KD tapes.
 
** Migration of LHCb data from T10KC to T10KD tapes.
 
* Networking:
 
* Networking:
** Replace the UKLight Router. Then upgrade the 'bypass' link to the RAL border routers to 2*40Gbit.
+
** Replace the UKLight Router. Then upgrade the 'bypass' link to the RAL border routers to 40Gbit.
 
* Fabric
 
* Fabric
 
** Firmware updates on older disk servers.
 
** Firmware updates on older disk servers.

Revision as of 12:08, 28 September 2016

RAL Tier1 Operations Report for 28th September 2016

Review of Issues during the week 21st to 28th September 2016.
  • At alast week's meeting we reported a problem with one of the OPN link with one of the links not working outbound. This was resolved on Thursday morning (22nd Sep). It was found the relevant protocol )ECMP) had been reset in UKLight Router. This was re-configured and the problem fixed.
  • On Sunday morning, there were problems with all three top-level BDIIs that lasted an hour or so. The automatic re-starters fixed it although the cause is not understood.
Resolved Disk Server Issues
  • GDSS617 (AliceDisk - D1T0) failed in the early hours of Saturday morning (24th Sep). It was returned to service, initially read-only on the evening of the same day. No specific fault found.
  • GDSS739 (LHCbDst - D1T0) failed in the early hours of Sunday morning (25th Sep). It was returned to service, initially read-only, at the end of Monday afternoon (26th Sep). Two faulty disks were replaced.
Current operational status and issues
  • There is a problem seen by LHCb of a low but persistent rate of failure when copying the results of batch jobs to Castor. There is also a further problem that sometimes occurs when these (failed) writes are attempted to storage at other sites.
  • The intermittent, low-level, load-related packet loss seen over external connections is still being tracked.
Ongoing Disk Server Issues
  • None
Notable Changes made since the last meeting.
  • We continue to move services (including arc-ce03) to the Hyper-V 2012 infrastructure.
  • arc-ce03 was re-installed on this infrastructure with a bigger disk.
Declared in the GOC DB

None

Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.

Listing by category:

  • Replace the UKLight Router including upgrading the 'bypass' link to the RAL border routers to 40Gbit. Being scheduled for Wednesday 5th October.
  • Intervention on Tape Libraries - early November.

Listing by category:

  • Castor:
    • Update SRMs to new version, including updating to SL6. This will be done after the Castor 2.1.15 update.
    • Update to Castor version 2.1.15. This awaits successful resolution and testing of the new version.
    • Migration of LHCb data from T10KC to T10KD tapes.
  • Networking:
    • Replace the UKLight Router. Then upgrade the 'bypass' link to the RAL border routers to 40Gbit.
  • Fabric
    • Firmware updates on older disk servers.
Entries in GOC DB starting since the last report.
Service Scheduled? Outage/At Risk Start End Duration Reason
arc-ce04.gridpp.rl.ac.uk SCHEDULED OUTAGE 23/09/2016 10:00 30/09/2016 18:00 7 days, 8 hours ARC-CE04 being drained ahead of a reconfiguration and move to run on different infrastructure.
arc-ce03.gridpp.rl.ac.uk SCHEDULED OUTAGE 15/09/2016 13:00 22/09/2016 18:00 7 days, 5 hours ARC-CE03 being drained ahead of a reconfiguration and move to run on different infrastructure.
Open GGUS Tickets (Snapshot during morning of meeting)
GGUS ID Level Urgency State Creation Last Update VO Subject
123504 Green Less Urgent Waiting for Reply 2016-08-19 2016-09-20 T2K proxy expiration
122827 Green Less Urgent Waiting for Reply 2016-07-12 2016-09-14 SNO+ Disk area at RAL
122364 Green Less Urgent On Hold 2016-06-27 2016-08-23 cvmfs support at RAL-LCG2 for solidexperiment.org
121687 Red Less Urgent On Hold 2016-05-20 2016-05-23 packet loss problems seen on RAL-LCG perfsonar
120350 Yellow Less Urgent On Hold 2016-03-22 2016-08-09 LSST Enable LSST at RAL
117683 Amber Less Urgent On Hold 2015-11-18 2016-04-05 CASTOR at RAL not publishing GLUE 2
Availability Report

Key: Atlas HC = Atlas HammerCloud (Queue ANALY_RAL_SL6, Template 729); CMS HC = CMS HammerCloud

Day OPS Alice Atlas CMS LHCb Atlas HC CMS HC Comment
21/09/16 100 100 100 93 100 N/A 100 Several SRM test failures because of a user timeout error
22/09/16 100 100 100 89 100 N/A 100 Block of problems with CE tests around lunchtime.
23/09/16 100 100 100 100 100 N/A 100
24/09/16 100 100 100 100 100 N/A 100
25/09/16 100 100 100 100 100 N/A 100
26/09/16 100 100 100 100 100 N/A 100
27/09/16 100 100 100 98 100 N/A 100 Single SRM test failure because of a user timeout error