Tier1 Operations Report 2014-11-12

From GridPP Wiki
Jump to: navigation, search

RAL Tier1 Operations Report for 12th November 2014

Review of Issues during the week 5th to 12th November 2014.
  • Some problems on Atals Castor instance.... Load (wait I/O)
Resolved Disk Server Issues
  • None
Current operational status and issues
  • None
Ongoing Disk Server Issues
  • None
Notable Changes made this last week.
  • Doubling the uplink (10 -> 20Gbit)on the network stack used by the Tape servers as the existing link was at full capacity.
Declared in the GOC DB


Service Scheduled? Outage/At Risk Start End Duration Reason
Atlas, CMS & LHCb Castor instances (srm-atlas, srm-cms, srm-lhcb) SCHEDULED WARNING 19/11/2014 11:00 19/11/2014 12:00 1 hour Warning on Castor Atlas, CMS and LHCb instance during application of OS errata updates.
Castor GEN instance SCHEDULED WARNING 12/11/2014 11:00 12/11/2014 12:00 1 hour Warning on Castor GEN instance during application of OS errata updates.


Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.
  • The rollout of the RIP protocol to the Tier1 routers still has to be completed.
  • First quarter 2015: Circuit testing of the remaining (i.e. non-UPS) circuits in the machine room.

Listing by category:

  • Databases:
    • A new database (Oracle RAC) has been set-up to host the Atlas3D database. This is updated from CERN via Oracle GoldenGate.
    • Switch LFC/3D to new Database Infrastructure.
  • Castor:
    • Update Castor headnodes to SL6.
    • Fix discrepancies were found in some of the Castor database tables and columns. (The issue has no operational impact.)
  • Networking:
    • Move switches connecting the 2011 disk servers batches onto the Tier1 mesh network.
    • Make routing changes to allow the removal of the UKLight Router.
    • Enable the RIP protocol for updating routing tables on the Tier1 routers.
  • Fabric
    • Migration of data to new T10KD tapes. (Migration of CMS from 'B' to 'D' tapes underway; migration of GEN from 'A' to 'D' tapes to follow.)
    • Firmware updates on remaining EMC disk arrays (Castor, FTS/LFC)
    • There will be circuit testing of the remaining (i.e. non-UPS) circuits in the machine room (Expected first quarter 2015).
Entries in GOC DB starting between the 5th and 12th November 2014.
Service Scheduled? Outage/At Risk Start End Duration Reason
Castor GEN instance SCHEDULED WARNING 12/11/2014 11:00 12/11/2014 12:00 1 hour Warning on Castor GEN instance during application of OS errata updates.
Whole site. UNSCHEDULED WARNING 05/11/2014 09:00 05/11/2014 10:00 1 hour Putting site At Risk for a reboot of network router. Anticipate only two very short (few seconds) break in connectivity.
Open GGUS Tickets (Snapshot during morning of meeting)
GGUS ID Level Urgency State Creation Last Update VO Subject
110028 Green Less Urgent Waiting for Reply 2014-11-10 2014-11-11 CMS Phedex transfer problems from T1_UK_RAL_Buffer
109712 Green Urgent On Hold 2014-10-29 2014-11-10 CMS Glexec exited with status 203; ...
109694 Green Urgent On hold 2014-11-03 2014-11-06 SNO+ gfal-copy failing for files at RAL
108944 Yellow Urgent On Hold 2014-10-01 2014-11-03 CMS AAA access test failing at T1_UK_RAL
107935 Red Less Urgent On Hold 2014-08-27 2014-11-03 Atlas BDII vs SRM inconsistent storage capacity numbers
106324 Red Urgent On Hold 2014-06-18 2014-10-13 CMS pilots losing network connections at T1_UK_RAL
Availability Report

Key: Atlas HC = Atlas HammerCloud (Queue ANALY_RAL_SL6, Template 508); CMS HC = CMS HammerCloud

Day OPS Alice Atlas CMS LHCb Atlas HC CMS HC Comment
05/11/14 100 100 100 100 100 100 100
06/11/14 100 100 89.3 100 100 100 100 Two blocks of test failures (06:00-07:00 & 09:00-10:00) Error 'Handling Timeout'.
07/11/14 100 100 96.5 100 100 100 100 Several SRM PUT test failures (timeouts).
08/11/14 100 100 100 100 100 100 100
09/11/14 100 100 100 100 100 100 100
10/11/14 100 100 100 100 100 100 100
11/11/14 100 100 98.3 100 100 100 98 Two SRM test failures one after the other.