RAL Tier1 Operations Report for 4th September 2013

Review of Issues during the week 28th August to 4th September 2013.
  • There were problems last Wednesday (28/08/2013) with the top level BDIIs. A workaround was put in place and the situation improved at the end of the afternoon.
  • At around 08:00 this morning the number of Atlas jobs running on the farm dropped suddenly by around 3000. This is not yet understood.
Resolved Disk Server Issues
  • None.
Current operational status and issues
  • The uplink to the UKLight Router is running on a single 10Gbit link, rather than a pair of such links.
  • The FTS3 testing has continued very actively. Atlas have moved the UK, German and French clouds to use it. Problems with FTS3 are being uncovered during these tests. Patches are being regularly applied to FTS3 to deal with issues. (The FTS3 servers were upgraded to version 3.1.5 1.el6 during this last week.)
  • We are participating in xrootd federated access tests for Atlas. The server has now been successfully configured to work as an xroot redirector, whereas before it could only serve as a proxy.
  • Testing is ongoing with the proposed new batch system (ARC-CEs, Condor, SL6). Atlas and CMS running work through this. ALICE, LHCb & H1 being brought on-board with the testing.
  • Atlas have reported a problem with file deletions going slow. This was investigaated but no cause found. Atlas have introduced a workround (shortening the time to re-try) but the underlying problem is not solved.
Ongoing Disk Server Issues
  • None
Notable Changes made this last fortnight.
  • On Friday (30th Aug) FTS3 was updated to version 3.1.5 1.el6.
  • Last Wednesday (28th Aug) the firmware on the EMC array under the Castor standby databases was successfully updated.
Declared in the GOC DB
  • LCGCE12 (CE for SL6 test Queue on the production batch farm) is in a long Outage ready for decommissioning.
  • LCGWMS04 is in Outage for an upgrade to EMI-3. (Anticipate return to production tomorrow).
Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.
  • The SL6 and "Whole Node" queues on the production batch service will be terminated. Multi-core jobs and those requiring SL6 can be run on the test Condor batch system.
  • Re-establishing the paired (2*10Gbit) link to the UKLight router.

Listing by category:

  • Databases:
    • Switch LFC/FTS/3D to new Database Infrastructure.
  • Castor:
    • None
  • Networking:
    • Single link to UKLight Router to be restored as paired (2*10Gbit) link.
    • Update core Tier1 network and change connection to site and OPN including:
      • Install new Routing layer for Tier1
      • Change the way the Tier1 connects to the RAL network.
      • These changes will lead to the removal of the UKLight Router.
  • Grid Services
    • Testing of alternative batch systems (SLURM, Condor) along with ARC-CEs and SL6 Worker Nodes.
  • Fabric
    • One of the disk arrays hosting the FTS, LFC & Atlas 3D databases is showing a fault and an intervention is required - initially to update the disk array's firmware.
  • Infrastructure:
    • A 2-day maintenance on the UPS along with the safety testing of associated electrical circuits is being planned for the 4th/5th November (TBC). The impact of this on our services is still being worked out. During this the following issues will be addressed:
      • Intervention required on the "Essential Power Board".
      • Remedial work on the BMS (Building Management System) due to one its three modules being faulty.
      • Electrical safety check. This will take place over a couple of days during which time individual UPS circuits will need to be powered down.
Entries in GOC DB starting between the 28th August and 4th September 2013.

There was one unscheduled Warning in the GOC DB for our ongoing top BDII issues (this was ongoing at the time of last week's meeting).

Service Scheduled? Outage/At Risk Start End Duration Reason
lcgwms04.gridpp.rl.ac.uk, SCHEDULED OUTAGE 29/08/2013 17:00 06/09/2013 16:00 7 days, 23 hours Upgrade to EMI-3
lcgbdii.gridpp.rl.ac.uk, UNSCHEDULED WARNING 28/08/2013 11:30 28/08/2013 16:00 4 hours and 30 minutes We are currently investigating problems on 2 (out of 3) top BDII servers.
lcgce12.gridpp.rl.ac.uk, SCHEDULED OUTAGE 06/08/2013 13:00 05/09/2013 13:00 30 days, CE (and the SL6 batch queue behind it) being decommissioned.


Open GGUS Tickets (Snapshot at time of meeting)
GGUS ID Level Urgency State Creation Last Update VO Subject
97025 Green Less urgent In Progress 2013-09-03 2013-09-04 Myproxy server certificate does not contain hostname
96968 Green Less urgent In Progress 2013-08-31 2013-08-31 CMS Black Node at T1_UK_RAL
96235 Red Less urgent waiting for reply 2013-07-29 2013-08-30 hyperk.org LFC for hyperk.org
96233 Red Less Urgent waiting for reply 2013-07-29 2013-08-28 hyperk.org WMS for hyperk.org - RAL
95996 Red Urgent In Progress 2013-07-22 2013-08-23 OPS SHA-2 test failing on lcgce01
91658 Red Less Urgent On Hold 2013-02-20 2013-08-09 LFC webdav support
86152 Red Less Urgent On Hold 2012-09-17 2013-17-06 correlated packet-loss on perfsonar host
Availability Report
Day OPS Alice Atlas CMS LHCb Comment
28/08/13 100 100 100 100 100
29/08/13 100 100 99.1 100 -100 Atlas: Single SRM Test failure: (Error reading token data header); LHCb: Test problem.
30/08/13 100 100 98.3 100 100 SRM Test failure ("Raising Timeout")
31/08/13 100 100 97.4 100 100 SRM Test failure ("Raising Timeout")
01/09/13 100 100 99.1 100 100 SRM Test failure ("Raising Timeout")
02/09/13 100 100 100 100 100
03/09/13 100 100 91.7 96.4 95.9 Atlas: SRM Test failures ("Raising Timeout"); CMS & LHCb: Each show "Single test failure (Error reading token data header: Connection closed)" - but at different times.