Difference between revisions of "RAL Tier1 weekly operations castor 26/08/2016"
Line 27: | Line 27: | ||
11. AoOtherB | 11. AoOtherB | ||
− | |||
== Operation problems == | == Operation problems == | ||
Line 37: | Line 36: | ||
== Operation news == | == Operation news == | ||
− | New WAN | + | New WAN tuning parameters were deployed on 12 cmsDosk servers |
− | + | ||
== Long-term projects == | == Long-term projects == | ||
Line 45: | Line 43: | ||
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started | SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started | ||
− | |||
== Actions == | == Actions == | ||
Line 52: | Line 49: | ||
RA decide what to do with persistent data (for daily test) is still on GenScratch | RA decide what to do with persistent data (for daily test) is still on GenScratch | ||
− | |||
== Completed actions == | == Completed actions == | ||
Line 64: | Line 60: | ||
RA on course until 8/9 | RA on course until 8/9 | ||
− | RA on call until 30/8 | + | RA on call until 30/8 |
CP on call from 31/8 - 6/9 | CP on call from 31/8 - 6/9 |
Latest revision as of 10:46, 26 August 2016
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Facilities drive reallocation 2. 2.1.15 3. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Problem with uploading data to RAL-BUFFER from lhcb GGUS ID#123521
Problems witth gfal-copy (na62) RT#174854
Operation news
New WAN tuning parameters were deployed on 12 cmsDosk servers
Long-term projects
Work on Castor 2.1.15 draining continues
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started
Actions
RA disks servers requiring RAID update - locate servers and plan for update with fabric
RA decide what to do with persistent data (for daily test) is still on GenScratch
Completed actions
RA to update the doc for xroot certificates
Stafing
RA, GP away to GridPP meeting until 2/9
RA on course until 8/9
RA on call until 30/8
CP on call from 31/8 - 6/9