Difference between revisions of "RAL Tier1 weekly operations castor 26/08/2016"

From GridPP Wiki
Jump to: navigation, search
 
Line 27: Line 27:
  
 
11. AoOtherB  
 
11. AoOtherB  
 
  
 
== Operation problems ==
 
== Operation problems ==
Line 37: Line 36:
 
== Operation news ==
 
== Operation news ==
  
New WAN tuninf parameters were deployed on 12 cmsDosk servers
+
New WAN tuning parameters were deployed on 12 cmsDosk servers
 
+
  
 
== Long-term projects ==
 
== Long-term projects ==
Line 45: Line 43:
  
 
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started
 
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started
 
  
 
== Actions ==
 
== Actions ==
Line 52: Line 49:
  
 
RA decide what to do with persistent data (for daily test) is still on GenScratch
 
RA decide what to do with persistent data (for daily test) is still on GenScratch
 
  
 
== Completed actions ==
 
== Completed actions ==
Line 64: Line 60:
 
RA on course until 8/9
 
RA on course until 8/9
  
RA on call until 30/8 and on 7/9
+
RA on call until 30/8
  
 
CP on call from 31/8 - 6/9
 
CP on call from 31/8 - 6/9

Latest revision as of 10:46, 26 August 2016

Draft agenda

1. Problems encountered this week

2. Upgrades/improvements made this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

    1. Facilities drive reallocation
    2. 2.1.15
    3. SL7 upgrade on tape servers

5. Special topics

6. Actions

7. Anything for CASTOR-Fabric?

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB

Operation problems

Problem with uploading data to RAL-BUFFER from lhcb GGUS ID#123521

Problems witth gfal-copy (na62) RT#174854

Operation news

New WAN tuning parameters were deployed on 12 cmsDosk servers

Long-term projects

Work on Castor 2.1.15 draining continues

SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started

Actions

RA disks servers requiring RAID update - locate servers and plan for update with fabric

RA decide what to do with persistent data (for daily test) is still on GenScratch

Completed actions

RA to update the doc for xroot certificates

Stafing

RA, GP away to GridPP meeting until 2/9

RA on course until 8/9

RA on call until 30/8

CP on call from 31/8 - 6/9