Difference between revisions of "RAL Tier1 weekly operations castor 26/08/2016"
(Created page with " == Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not...") |
|||
Line 31: | Line 31: | ||
== Operation problems == | == Operation problems == | ||
− | Problem with uploading data to RAL-BUFFER from lhcb[https://ggus.eu/?mode=ticket_info&ticket_id=123521 GGUS ID#123521] | + | Problem with uploading data to RAL-BUFFER from lhcb [https://ggus.eu/?mode=ticket_info&ticket_id=123521 GGUS ID#123521] |
Problems witth gfal-copy (na62) [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=174854&results=8ad9ee2ff21b92c49874a1b4fd05c5a9 RT#174854] | Problems witth gfal-copy (na62) [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=174854&results=8ad9ee2ff21b92c49874a1b4fd05c5a9 RT#174854] | ||
+ | |||
+ | == Operation news == | ||
+ | |||
+ | New WAN tuninf parameters were deployed on 12 cmsDosk servers | ||
+ | |||
+ | |||
+ | == Long-term projects == | ||
+ | |||
+ | Work on Castor 2.1.15 draining continues | ||
+ | |||
+ | SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started | ||
+ | |||
+ | |||
+ | == Actions == | ||
+ | |||
+ | RA disks servers requiring RAID update - locate servers and plan for update with fabric | ||
+ | |||
+ | RA decide what to do with persistent data (for daily test) is still on GenScratch | ||
+ | |||
+ | |||
+ | == Completed actions == | ||
+ | |||
+ | RA to update the doc for xroot certificates | ||
+ | |||
+ | == Stafing == | ||
+ | |||
+ | RA, GP away to GridPP meeting until 2/9 | ||
+ | |||
+ | RA on course until 8/9 | ||
+ | |||
+ | RA on call until 30/8 and on 7/9 | ||
+ | |||
+ | CP on call from 31/8 - 6/9 |
Revision as of 10:42, 26 August 2016
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Facilities drive reallocation 2. 2.1.15 3. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Problem with uploading data to RAL-BUFFER from lhcb GGUS ID#123521
Problems witth gfal-copy (na62) RT#174854
Operation news
New WAN tuninf parameters were deployed on 12 cmsDosk servers
Long-term projects
Work on Castor 2.1.15 draining continues
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR has started
Actions
RA disks servers requiring RAID update - locate servers and plan for update with fabric
RA decide what to do with persistent data (for daily test) is still on GenScratch
Completed actions
RA to update the doc for xroot certificates
Stafing
RA, GP away to GridPP meeting until 2/9
RA on course until 8/9
RA on call until 30/8 and on 7/9
CP on call from 31/8 - 6/9