(Created page with "[https://www.gridpp.ac.uk/wiki/RAL_Tier1_weekly_operations_castor Parent article] == Standing agenda == 1. Achievements this week 2. Problems encountered this week 3. What...")
 
Line 30: Line 30:
 
* Facilities headnodes requested on VMWare, ticket not done yet. Facilities VMWare cluster still under construction
 
* Facilities headnodes requested on VMWare, ticket not done yet. Facilities VMWare cluster still under construction
 
** Willing to accept delays on this until ~May
 
** Willing to accept delays on this until ~May
** Queued behind tape robot and a number of Diamond ICAT tasks
+
** Progress ongoing.
 
* Aquilon disk servers ready to go, also queued behind tape robot
 
* Aquilon disk servers ready to go, also queued behind tape robot
 +
** Designing a stress test based on CC meeting (IOZone on SL6, IOZone on SL7, compare)
 
* New Spectra tape robot
 
* New Spectra tape robot
** Finalised configuration for the Tape servers
+
** Fibre-optic cabling up ongoing.
* Produced lots of stats on CASTOR ingest rates
+
** Initial performance tests promising (800MB/s)
 +
* LHCb now running batch jobs using Echo
 +
* Migrated Facilities CASTOR from Juno to Bellona.
  
 
== Operation problems ==
 
== Operation problems ==
  
* gdss738 (lhcbDst) failed, back in production read-only.
+
* T2K issues with finding files on tape (GGUS 140870) - Currently on Alastair
* gdss811 (lhcbDst) returned to prod in the pre-Easter week with an HDD for the OS instead of an SSD
+
* ATLAS are periodically submitting SAM tests that impact availability and cause pointless callouts - Currently with Tim Adye
* T2K issues with finding files on tape (GGUS 140870)
+
* ATLAS are periodically submitting SAM tests that impact availability and cause pointless callouts
+
** TA has updated the ticket, indicating he will raise the issue with the appropriate people
+
* LHCb raised an issue with xroot access to lhcbUser, believed to be resolved now.
+
  
 
== Plans for next few weeks ==
 
== Plans for next few weeks ==
Line 50: Line 49:
 
** CASTOR team to generate a list of nonstandard settings and consider whether they are justified.
 
** CASTOR team to generate a list of nonstandard settings and consider whether they are justified.
 
* Castor tape testing to continue after the production tape robot networking is installed
 
* Castor tape testing to continue after the production tape robot networking is installed
* Test preprod against Bellona (RT223698)
 
  
 
== Long-term projects ==
 
== Long-term projects ==
Line 57: Line 55:
 
** LHCb migration to Echo is in progress, being sped up by failing CASTOR disk servers
 
** LHCb migration to Echo is in progress, being sped up by failing CASTOR disk servers
 
* CASTOR disk server migration to Aquilon.
 
* CASTOR disk server migration to Aquilon.
** Need to work with Fabric to get a realistic.
+
** Need to work with Fabric to get a stress test (see above)
* Deadline of end of April to get Facilities moved to generic VM headnodes and 2.1.17 tape servers.
+
** Ticket with Fabric team to make the VMs.
+
 
* The problem of castor-functional-test1 has been absorbed into the task of sorting out worker node grid-mapfile generation and distribution.
 
* The problem of castor-functional-test1 has been absorbed into the task of sorting out worker node grid-mapfile generation and distribution.
  
Line 75: Line 71:
  
 
== Staffing ==
 
== Staffing ==
 +
 +
Rob out from end of next week.
  
 
== AoB ==
 
== AoB ==
Line 80: Line 78:
 
== On Call ==
 
== On Call ==
  
RA on call.
+
GP on call.

Revision as of 09:48, 3 May 2019

Parent article

Standing agenda

1. Achievements this week

2. Problems encountered this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

5. Special topics

6. Actions

7. Review Fabric tasks

  1.   Link

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB

Achievements this week

  • Facilities headnodes requested on VMWare, ticket not done yet. Facilities VMWare cluster still under construction
    • Willing to accept delays on this until ~May
    • Progress ongoing.
  • Aquilon disk servers ready to go, also queued behind tape robot
    • Designing a stress test based on CC meeting (IOZone on SL6, IOZone on SL7, compare)
  • New Spectra tape robot
    • Fibre-optic cabling up ongoing.
    • Initial performance tests promising (800MB/s)
  • LHCb now running batch jobs using Echo
  • Migrated Facilities CASTOR from Juno to Bellona.

Operation problems

  • T2K issues with finding files on tape (GGUS 140870) - Currently on Alastair
  • ATLAS are periodically submitting SAM tests that impact availability and cause pointless callouts - Currently with Tim Adye

Plans for next few weeks

  • Examine further standardisation of CASTOR pool settings.
    • CASTOR team to generate a list of nonstandard settings and consider whether they are justified.
  • Castor tape testing to continue after the production tape robot networking is installed

Long-term projects

  • New CASTOR WLCGTape instance.
    • LHCb migration to Echo is in progress, being sped up by failing CASTOR disk servers
  • CASTOR disk server migration to Aquilon.
    • Need to work with Fabric to get a stress test (see above)
  • The problem of castor-functional-test1 has been absorbed into the task of sorting out worker node grid-mapfile generation and distribution.

Actions

  • AD wants us to make sure that experiments cannot write to that part of namespace that was used for d1t0 data: namespace cleanup/deletion of empty dirs.
    • Some discussion about what exactly is required and how this can be actually implemented.
    • CASTOR team proposal is either:
      • to switch all of these directories to a fileclass with a requirement for a tape copy but no migration route; this will cause an error whenever any writes are attempted.
      • to run a recursive nschmod on all the unneeded directories to make them read only.
      • CASTOR team split over the correct approach.
  • Problem with functional test node using a personal proxy which runs out some time in July.
    • RA met with JJ, requested an appropriate certificate.
  • RA and DM to sit down to sort out storage metric question

Staffing

Rob out from end of next week.

AoB

On Call

GP on call.