Difference between revisions of "RAL Tier1 weekly operations castor 24/06/2016"

From GridPP Wiki
Jump to: navigation, search
(Created page with " == Minutes from the previous meeting == Operation problems Hot SRM for gen aminly due to t2k transfers Tape library problems occured again early this week. There was an ins...")
 
Line 55: Line 55:
  
 
== Long-term projects ==
 
== Long-term projects ==
 +
 +
== Stafing ==
 +
All here
 +
RA on call
 +
 +
== Actions ==
 +
 +
RA to update the doc for xroot certificates
 +
 +
GP to ask Jens about the pending membership request to dteam VO
 +
 +
GP to review mailing lists he is on
 +
 +
GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters
 +
 +
GP to arrange a meeting with Bruno about the aquilon migration and the SL7 upgrade
 +
 +
RA SRM DB duplicates removal script is under testing
 +
 +
 +
== Completed actions ==
 +
 +
CP to request final confirmation from Diamond and do test recalls on the zero-sized files

Revision as of 11:04, 24 June 2016

Minutes from the previous meeting

Operation problems

Hot SRM for gen aminly due to t2k transfers

Tape library problems occured again early this week. There was an instability with the ACSLS software last night. Tim will put a new machine running ACSLS today

DB resources exhaustion issues. Around 15 June there were about twice as much writes to the primary database causing ca. 20 min of writes to standby database Need to keep track of DB activity over the next weeks Long-term projects

RA did some debugging work on 2.1.15 in CERN and he found out that the SRM problem is not trivial. He will be in touch with Giusepe about this.

CASTOR will be replaced in CERN by 2022. Need to consider what will happen in RAL Staffing

RA on annual leave during next week

BD in a meeting from Mon to Thu

CP/BD will attend the Data Intensive workshop on Mon

CP on call next week Actions

CP to request final confirmation from Diamond and do test recalls on the zero-sized files

RA to update the doc for xroot certificates

GP to ask Jens about the pending membership request to dteam VO

GP to review mailing lists he is on

GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters

GP to arrange a meeting with Bruno about the aquilon migration and the SL7 upgrade

RA SRM DB duplicates removal script is under testing Completed actions

BD to review outstanding RT tickets on CASTOR queue

GP access GOCDB

Operation news

DB has appears to have caught up with the increased number of ATLAS writes

Operation problems

Backup DB of CASTOR database (Nepturne) failed and the content was lost. The hardware is now fixed and the DB is now back on production

Disk servers 743 and 748 failed and went out or production earlier this week

Long-term projects

Stafing

All here RA on call

Actions

RA to update the doc for xroot certificates

GP to ask Jens about the pending membership request to dteam VO

GP to review mailing lists he is on

GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters

GP to arrange a meeting with Bruno about the aquilon migration and the SL7 upgrade

RA SRM DB duplicates removal script is under testing


Completed actions

CP to request final confirmation from Diamond and do test recalls on the zero-sized files