Difference between revisions of "RAL Tier1 weekly operations castor 21/4/2017"

From GridPP Wiki
Jump to: navigation, search
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not ...")
 
Line 46: Line 46:
  
 
== Actions ==  
 
== Actions ==  
 
Drain 10% of the 13 generation of disk servers (lhcbDst) for decommissioning
 
  
 
Generate a CASTOR bug report for the the open DB cursors problem
 
Generate a CASTOR bug report for the the open DB cursors problem
Line 55: Line 53:
 
== Staffing ==
 
== Staffing ==
  
GP on call next week  
+
RA on call next week  
  
RA away
+
AP away on HEPIX

Revision as of 11:38, 26 April 2017

Draft agenda

1. Problems encountered this week

2. Upgrades/improvements made this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

  1. SL7 upgrade on tape servers
  2. SRM upgrade to SL6/CASTOR 2.1.16
  3. SL5 elimination from CASTOR functional test boxes and tape verification server

5. Special topics

6. Actions

7. Anything for CASTOR-Fabric?

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB

Operation problems

Problems with the LHCb SRMs continue though after the downgrade to CASTOR 2.1.11 they have been more or less stable

Operation news

Plans for next week

RA to work on the 2.16-13 upgrade on preprod

Long-term projects

CIP migration to aquilon and upgrade to SL6

SL6 upgrade on functional test boxes and tape verification server

Tape-server migration to aquilon and SL7 upgrade (on hold for the moment)

Actions

Generate a CASTOR bug report for the the open DB cursors problem

Add GP to the mail of CASTOR overwatch script

Staffing

RA on call next week

AP away on HEPIX