RAL Tier1 weekly operations castor 20/05/2016
Operation news
Automated workflow for disk server deployment has been disabled New CASTOR functional testing using xrootd will be enabled on Monday 23/5/2016
CASTOR issues
Heavy wokload on the Atlas scracth disk resulting in almost nothing being achieved
Full recover from the tape robot and air condition problems
Double put start on CASTOR facilities
Some work to be done on the improvement of the logic of the new draining script
gdss664 was brought back to production on 18/05/2016 at ca. 15:00 folowing a sucessfull rebuilding
GDSS727 (production D1T0 CMS disk server) FSProbe Error It has been removed from Production and Overwatch Updated (Gareth, RT 172141
Ongoing work on the upgrade to CASTOR 2.1.15 on preprod
GP and BD to chase the dteam for the GP membership request
GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters
GP to talk to Andrew Lahiff about a SL7 upgrade on the worker nodes
SRM DB duplicates removal script is under testing
BD AND RA will test the newly created tape families for ATLAS