RAL Tier1 weekly operations castor 20/05/2016

From GridPP Wiki
Jump to: navigation, search

Operation news

Automated workflow for disk server deployment has been disabled New CASTOR functional testing using xrootd will be enabled on Monday 23/5/2016

CASTOR issues

Heavy wokload on the Atlas scracth disk resulting in almost nothing being achieved

Full recover from the tape robot and air condition problems

Double put start on CASTOR facilities

Some work to be done on the improvement of the logic of the new draining script

gdss664 was brought back to production on 18/05/2016 at ca. 15:00 folowing a sucessfull rebuilding

GDSS727 (production D1T0 CMS disk server) FSProbe Error It has been removed from Production and Overwatch Updated (Gareth, RT 172141

Ongoing work on the upgrade to CASTOR 2.1.15 on preprod

GP and BD to chase the dteam for the GP membership request

GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters

GP to talk to Andrew Lahiff about a SL7 upgrade on the worker nodes

SRM DB duplicates removal script is under testing

BD AND RA will test the newly created tape families for ATLAS