Difference between revisions of "RAL Tier1 weekly operations castor 20/05/2016"

From GridPP Wiki
Jump to: navigation, search
(CASTOR issues)
(CASTOR issues)
Line 13: Line 13:
 
Double put start on CASTOR facilities
 
Double put start on CASTOR facilities
  
Some work to be done on the imrovement of the logic of the new draining script  
+
Some work to be done on the improvement of the logic of the new draining script  
  
gdss664 was brought back to production on 18/05/2016 at ca. 15:00 folowing a sucessfull
+
gdss664 was brought back to production on 18/05/2016 at ca. 15:00 folowing a sucessfull rebuilding  
rebuilding  
+
  
 
GDSS727 (production D1T0 CMS disk server) FSProbe Error
 
GDSS727 (production D1T0 CMS disk server) FSProbe Error
It has been removed from Production and Overwatch Updated (Gareth, [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=172141])
+
It has been removed from Production and Overwatch Updated (Gareth, [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=172141 RT 172141]
  
 
Ongoing work on the upgrade to CASTOR 2.1.15 on preprod
 
Ongoing work on the upgrade to CASTOR 2.1.15 on preprod
  
GP to talk to Andrew Lahif about a SL7 upgrade on the worker nodes
+
GP and BD to chase the dteam for the GP membership request
 +
 
 +
GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters
 +
 
 +
GP to talk to Andrew Lahiff about a SL7 upgrade on the worker nodes
  
 
SRM DB duplicates removal script is under testing
 
SRM DB duplicates removal script is under testing
  
Will test the newly created taple families for ATLAS
+
BD AND RA will test the newly created tape families for ATLAS

Revision as of 10:39, 20 May 2016

Operation news

Automated workflow for disk server deployment has been disabled New CASTOR functional testing using xrootd will be enabled on Monday 23/5/2016

CASTOR issues

Heavy wokload on the Atlas scracth disk resulting in almost nothing being achieved

Full recover from the tape robot and air condition problems

Double put start on CASTOR facilities

Some work to be done on the improvement of the logic of the new draining script

gdss664 was brought back to production on 18/05/2016 at ca. 15:00 folowing a sucessfull rebuilding

GDSS727 (production D1T0 CMS disk server) FSProbe Error It has been removed from Production and Overwatch Updated (Gareth, RT 172141

Ongoing work on the upgrade to CASTOR 2.1.15 on preprod

GP and BD to chase the dteam for the GP membership request

GP and BD to perform stress testing of gdss596 to evaluate the new WAN parameters

GP to talk to Andrew Lahiff about a SL7 upgrade on the worker nodes

SRM DB duplicates removal script is under testing

BD AND RA will test the newly created tape families for ATLAS