Difference between revisions of "RAL Tier1 weekly operations castor 19/10/2018"

From GridPP Wiki
Jump to: navigation, search
(Created page with "== Standing agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if n...")
 
 
Line 8: Line 8:
  
 
4. Long-term project updates (if not already covered)
 
4. Long-term project updates (if not already covered)
 
  1. SL5 elimination from CIP and tape verification server
 
  2. CASTOR stress test improvement
 
  3. Generic CASTOR headnode setup
 
  4. Aquilonised headnodes
 
  
 
5. Special topics
 
5. Special topics
Line 31: Line 26:
 
== Operation problems ==
 
== Operation problems ==
  
OPS tests for WLCGTape are failing and a change in static ldif file needs to be made
+
== Operation news ==
  
AAA issues with CMS [https://ggus.eu/index.php?mode=ticket_info&ticket_id=137650 GGUS137650]
+
Disabled atlasStripInput disk servers
  
gdss734 and gdss738 failed and temporarily removed from prod; they are back now
+
Deleted CMS files as requested by Katy and Chris
 
+
tnsnames.ora issue on vCert and WLCGTape (the file was updated by a cron job script provided by
+
oracle-instantclient-tnsnames.ora-1-3.el7.cern.noarch). Now fixed
+
 
+
== Operation news ==
+
 
+
Two drives were added to fdscts01 and fdscts04
+
  
 
== Plans for next few weeks ==
 
== Plans for next few weeks ==
 
    
 
    
 
   * Push gsi authentication for xrootd in production
 
   * Push gsi authentication for xrootd in production
 
  * Decommission gdss747 & gdss753
 
 
   
 
   
 
   * Proceed with the atlasStripInput decommissioning
 
   * Proceed with the atlasStripInput decommissioning
Line 62: Line 48:
  
 
== Actions ==  
 
== Actions ==  
 
GP to add ldif entry for the new srm-wlcgtape endpoint
 
  
 
== Staffing ==
 
== Staffing ==
  
RA on call
+
GP on call

Latest revision as of 09:52, 19 October 2018

Standing agenda

1. Problems encountered this week

2. Upgrades/improvements made this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

5. Special topics

6. Actions

7. Review Fabric tasks

  1.   Link

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB

Operation problems

Operation news

Disabled atlasStripInput disk servers

Deleted CMS files as requested by Katy and Chris

Plans for next few weeks

  * Push gsi authentication for xrootd in production

  * Proceed with the atlasStripInput decommissioning
  * Proceed with the cmsDisk decommissioning

Long-term projects

gsi authentication for xrootd: 1) Ask Raja and Tim to run a functional test on preprod to make sure their prod users work 2) Perform a stress test

New CASTOR WLCGTape instance. Things need doing: 1) Update of the CASTOR ldif file and 2) Xrootd functional test on castor-fuctional-test1 3) Fix a misconfiguration on the Eris disk array (cannot bring WLCGTape into prod before this is done) 4) xrootd for ALICE

Actions

Staffing

GP on call