Difference between revisions of "RAL Tier1 weekly operations castor 19/08/2016"

From GridPP Wiki
Jump to: navigation, search
(Created page with " == Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not al...")
 
 
(8 intermediate revisions by one user not shown)
Line 1: Line 1:
 
 
== Draft agenda ==
 
== Draft agenda ==
  
 
1. Problems encountered this week
 
1. Problems encountered this week
 +
 
2. Upgrades/improvements made this week
 
2. Upgrades/improvements made this week
 +
 
3. What are we planning to do next week?
 
3. What are we planning to do next week?
 +
 
4. Long-term project updates (if not already covered)
 
4. Long-term project updates (if not already covered)
 +
 
       1. Facilities drive reallocation
 
       1. Facilities drive reallocation
 
       2. 2.1.15
 
       2. 2.1.15
 
       3. SL7 upgrade on tape servers
 
       3. SL7 upgrade on tape servers
 +
 
5. Special topics
 
5. Special topics
 +
 
6. Actions
 
6. Actions
 +
 
7. Anything for CASTOR-Fabric?
 
7. Anything for CASTOR-Fabric?
 +
 
8. AoTechnicalB
 
8. AoTechnicalB
 +
 
9. Availability for next week
 
9. Availability for next week
 +
 
10. On-Call
 
10. On-Call
 +
 
11. AoOtherB
 
11. AoOtherB
  
 
== Operation problems ==
 
== Operation problems ==
  
 +
Data packet loss observed in the internal network
  
 
== Operation news ==
 
== Operation news ==
 
  
 
== Long-term projects ==
 
== Long-term projects ==
Line 28: Line 38:
  
 
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled
 
SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled
 
  
 
== Actions ==
 
== Actions ==
Line 37: Line 46:
  
 
RA to update the doc for xroot certificates
 
RA to update the doc for xroot certificates
 
  
 
== Completed actions ==
 
== Completed actions ==
  
 
GP to present the stress test results of gdss596 configured with the WAN tuning parameters  
 
GP to present the stress test results of gdss596 configured with the WAN tuning parameters  
 
  
 
== Staffing ==
 
== Staffing ==
Line 48: Line 55:
 
RA on call  
 
RA on call  
  
CP,AS away
+
CP, AS away

Latest revision as of 09:00, 26 August 2016

Draft agenda

1. Problems encountered this week

2. Upgrades/improvements made this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

     1. Facilities drive reallocation
     2. 2.1.15
     3. SL7 upgrade on tape servers

5. Special topics

6. Actions

7. Anything for CASTOR-Fabric?

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB

Operation problems

Data packet loss observed in the internal network

Operation news

Long-term projects

Work on Castor 2.1.15 draining continues

SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled

Actions

RA disks servers requiring RAID update - locate servers and plan for update with fabric

RA decide what to do with persistent data (for daily test) is still on GenScratch

RA to update the doc for xroot certificates

Completed actions

GP to present the stress test results of gdss596 configured with the WAN tuning parameters

Staffing

RA on call

CP, AS away