Difference between revisions of "RAL Tier1 weekly operations castor 19/08/2016"

From GridPP Wiki
Jump to: navigation, search
(Created page with " == Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not al...")
 
(Draft agenda)
Line 1: Line 1:
  
 
== Draft agenda ==
 
== Draft agenda ==
 
1. Problems encountered this week
 
2. Upgrades/improvements made this week
 
3. What are we planning to do next week?
 
4. Long-term project updates (if not already covered)
 
      1. Facilities drive reallocation
 
      2. 2.1.15
 
      3. SL7 upgrade on tape servers
 
5. Special topics
 
6. Actions
 
7. Anything for CASTOR-Fabric?
 
8. AoTechnicalB
 
9. Availability for next week
 
10. On-Call
 
11. AoOtherB
 
  
 
== Operation problems ==
 
== Operation problems ==

Revision as of 08:55, 26 August 2016

Draft agenda

Operation problems

Operation news

Long-term projects

Work on Castor 2.1.15 draining continues

SL7 upgrade on the tape servers: Initial construction of aquilon template structure for CASTOR scheduled


Actions

RA disks servers requiring RAID update - locate servers and plan for update with fabric

RA decide what to do with persistent data (for daily test) is still on GenScratch

RA to update the doc for xroot certificates


Completed actions

GP to present the stress test results of gdss596 configured with the WAN tuning parameters


Staffing

RA on call

CP,AS away