Difference between revisions of "RAL Tier1 weekly operations castor 17/09/2012"

From GridPP Wiki
Jump to: navigation, search
 
(No difference)

Latest revision as of 14:45, 17 September 2012

Operations News

  • Late testing against preprod showed problems against 2.1.12 - forcing LHCb upgrade to be postponed:
    • xroot component kept crashing during testing on preprod due to a corrupted installation. Once xroot RPMs were reinstalled, everything was ok.
    • CIP broken due to architectural changes (breaking of svcclass/tapepool link in DB). A new version has been developed which relies upon the links being hardcoded in a configuration file.
  • Transfer manager has been doubled up across all instances

Operations Problems

  • none

Blocking Issues

none

Planned, Scheduled and Cancelled Interventions

Entries in/planned to go to GOCDB

Description Start End Type Affected VO(s) Lead by
2.1.12-10 Stager upgrade 25/09/12 08:00 25/09/12 14:00 Downtime ATLAS Matthew

Advanced Planning

Tasks

  • Test and certify 2.1.12-10
  • Test and certify 2.1.13-??

Interventions

  • Stager upgrades to 2.1.12 on Tier1 instances now we're happy with TM/TG (12Q4)

Staffing

  • Castor on Call person
    • Matthew
  • Staff absence/out of the office:
    • Jens working out of the office all week