RAL Tier1 weekly operations castor 15/07/2013

From GridPP Wiki
Revision as of 13:44, 16 July 2013 by Matt viljoen (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operations News

  • ATLAS STAGER successfully upgraded to 2.1.13-9-2

Operations Problems

  • An overrun of 4 hours during the ATLAS 2.1.13 upgrade was due to inadequate testing of xrootd and gridftp protocols. The preprod instance needs to be enhanced so realistic tests can be run against it using these protocols.

Blocking Issues

  • none

Planned, Scheduled and Cancelled Interventions

Entries in/planned to go to GOCDB ATLAS stager upgrade to 2.1.13-9 on Wednesday

Advanced Planning

Tasks

  • None

Interventions

  • Upgrade remaining Tier 1 stagers from 2.1.12 to 2.1.13

Staffing

  • Castor on Call person
    • Matt
  • Staff absence/out of the office:
    • (Tue-Thu) Shaun at CRISTAL 3 course
    • (Wed) DS away day. Matt working remotely PM