Difference between revisions of "RAL Tier1 weekly operations castor 1/9/2017"
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not ...") |
(→Operation problems) |
||
(3 intermediate revisions by one user not shown) | |||
Line 29: | Line 29: | ||
== Operation problems == | == Operation problems == | ||
+ | |||
+ | Lots of files on canbemigr state on Atlas, CMS and Gen [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=194371 RT194731]. CMS and Gen are still competing for tape-drives | ||
lcgcts22 and lcgcts27 were down | lcgcts22 and lcgcts27 were down | ||
+ | |||
+ | Problems with the SL6 upgrade of the tape verification servers [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=193596 RT193596] | ||
== Operation news == | == Operation news == | ||
Line 41: | Line 45: | ||
Continue work on tape-server migration to aquilon | Continue work on tape-server migration to aquilon | ||
+ | |||
+ | Complete the deployment of the sic V12/OCF12 disk servers into lhcbRawRdst | ||
== Long-term projects == | == Long-term projects == |
Latest revision as of 10:05, 4 September 2017
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. SL7 upgrade on tape servers 2. SL5 elimination from CASTOR functional test boxes and tape verification server 3. CASTOR stress test improvement 4. Generic CASTOR headnode setup
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Lots of files on canbemigr state on Atlas, CMS and Gen RT194731. CMS and Gen are still competing for tape-drives
lcgcts22 and lcgcts27 were down
Problems with the SL6 upgrade of the tape verification servers RT193596
Operation news
The new facilities headnodes have been deployed
Plans for next week
Deployment of the new ral-castor tools version
Continue work on tape-server migration to aquilon
Complete the deployment of the sic V12/OCF12 disk servers into lhcbRawRdst
Long-term projects
Tape-server migration to aquilon and SL7 upgrade
CASTOR stress test improvement
Configure multiple instances of a CASTOR generic headnode
Drain and decomission/recomission the 12 generation disk servers
Actions
RA to check if the disk server setting, changed to bring disk servers back more quickly after a CASTOR shutdown, is still in place
Ensure that Fabric is on track with the deployment of the new DB hardware
RA to ensure that proper Nagios checks are in place for the xroot manager boxes
RA and JK to do the the new service checklist for the new functional test box (castor-functional-test1)
GP to talk to AL about service ownership/handover of the xroot manager boxes
Staffing
GP on call until Firday, then RA