Difference between revisions of "RAL Tier1 weekly operations castor 09/1/2017"
From GridPP Wiki
(→Operation problems) |
(→Operation news) |
||
Line 35: | Line 35: | ||
== Operation news == | == Operation news == | ||
+ | |||
+ | The firmware upgrade on all V13 disk servers was completed [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=182223 RT182223] | ||
+ | |||
+ | All production SRMs have been patched [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=182223 RT182223] |
Revision as of 14:15, 9 January 2017
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Castor 2.1.15 2. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
There was a lag in file transfer from to StorageD to CASTOR
SAM tests failed over Christmas and today
gdss655 RT184514 and gdss780 RT184616 failed and removed from production
Operation news
The firmware upgrade on all V13 disk servers was completed RT182223
All production SRMs have been patched RT182223