Difference between revisions of "RAL Tier1 weekly operations castor 09/09/2016"
From GridPP Wiki
(Created page with " == Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not...") |
|||
Line 30: | Line 30: | ||
== Operation problems == | == Operation problems == | ||
+ | |||
+ | gdss665 (atlasTape) and gdss776 (lhcbDst) failed and went out of production - see [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=175224 RT 175224] and [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=175196 RT 175196] | ||
+ | gdss776 is back to prod | ||
== Operation news == | == Operation news == |
Revision as of 10:24, 9 September 2016
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Facilities drive reallocation 2. 2.1.15 3. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
gdss665 (atlasTape) and gdss776 (lhcbDst) failed and went out of production - see RT 175224 and RT 175196
gdss776 is back to prod