Difference between revisions of "RAL Tier1 weekly operations castor 09/09/2016"

From GridPP Wiki
Jump to: navigation, search
(Created page with " == Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not...")
 
Line 30: Line 30:
  
 
== Operation problems ==
 
== Operation problems ==
 +
 +
gdss665 (atlasTape) and gdss776 (lhcbDst) failed and went out of production - see [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=175224 RT 175224] and [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=175196 RT 175196]
 +
gdss776 is back to prod
  
 
== Operation news ==
 
== Operation news ==

Revision as of 10:24, 9 September 2016

Draft agenda

1. Problems encountered this week

2. Upgrades/improvements made this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

   1. Facilities drive reallocation
   2. 2.1.15
   3. SL7 upgrade on tape servers

5. Special topics

6. Actions

7. Anything for CASTOR-Fabric?

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB


Operation problems

gdss665 (atlasTape) and gdss776 (lhcbDst) failed and went out of production - see RT 175224 and RT 175196

gdss776 is back to prod 

Operation news