RAL Tier1 weekly operations castor 06/01/2013

From GridPP Wiki
Revision as of 13:48, 3 January 2014 by Matt viljoen (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operations News

  • 2.1.14 stress testing on preprod restarted on 2 Jan with the latest configuration changes (xrootd weighings increased within the transfer manager) after instabilities during previous stress testing runs.

Operations Problems

  • ..

Blocking Issues

  • none

Planned, Scheduled and Cancelled Interventions

Entries in/planned to go to GOCDB

  • none

Advanced Planning

Tasks

  • CASTOR 2.1.14 + SL5/6 testing
  • The separation of the Facilities and Tier 1 networks is planned during the first two weeks of January.

Interventions

  • none

Staffing

  • Castor on Call person
    • Matthew
  • Staff absence/out of the office:
    • ..