Difference between revisions of "RAL Tier1 weekly operations castor 05/01/2018"
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 1. Facilities Headnode Replacement ...") |
|||
Line 6: | Line 6: | ||
3. What are we planning to do next week? | 3. What are we planning to do next week? | ||
− | |||
4. Long-term project updates (if not already covered) | 4. Long-term project updates (if not already covered) | ||
Line 30: | Line 29: | ||
== Operation problems == | == Operation problems == | ||
− | + | Quiet Christmas aside from disk server issues. | |
+ | |||
+ | Major failure on gdss745 (atlasStripInput), possible loss of the whole server. | ||
+ | |||
+ | gdss756 out of production, expected back in production shortly. | ||
------ | ------ | ||
− | + | LHCb DB thread count increase worked (?); on Monday plan to reduce back to original setting (maybe in 2-3 steps) | |
== Operation news == | == Operation news == | ||
Line 42: | Line 45: | ||
== Plans for next week == | == Plans for next week == | ||
− | + | Work on cattle headnodes. | |
== Long-term projects == | == Long-term projects == | ||
Line 58: | Line 61: | ||
RA to check if the disk server setting, changed to bring disk servers back more quickly after a CASTOR shutdown, is still in place | RA to check if the disk server setting, changed to bring disk servers back more quickly after a CASTOR shutdown, is still in place | ||
− | RA/ | + | RA/BD: Run GFAL unit tests against CASTOR. Get them here: https://gitlab.cern.ch/dmc/gfal2/tree/develop/test/ |
GP: Turn CASTOR SRMs & other Aquilonised nodes from clients to servers | GP: Turn CASTOR SRMs & other Aquilonised nodes from clients to servers | ||
Line 66: | Line 69: | ||
== Staffing == | == Staffing == | ||
− | GP out until | + | GP out until 15th January |
RA on call | RA on call |
Latest revision as of 11:42, 5 January 2018
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week? 4. Long-term project updates (if not already covered)
1. SL5 elimination from CIP and tape verification server 2. CASTOR stress test improvement 3. Generic CASTOR headnode setup 4. Aquilonised headnodes
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
Quiet Christmas aside from disk server issues.
Major failure on gdss745 (atlasStripInput), possible loss of the whole server.
gdss756 out of production, expected back in production shortly.
LHCb DB thread count increase worked (?); on Monday plan to reduce back to original setting (maybe in 2-3 steps)
Operation news
Plans for next week
Work on cattle headnodes.
Long-term projects
CASTOR stress test improvement - Script writing, awaiting testing and validation
Headnode migration to Aquilon - Stager configuration almost complete; functional tests pass. Focus on features but not personalities
Target: Combined headnodes running on SL7/Aquilon - implement CERN-style 'Macro' headnodes.
Draining of remainder of 12 generation HW - waiting on CMS migration to Echo. No more draining ongoing.
Actions
RA to check if the disk server setting, changed to bring disk servers back more quickly after a CASTOR shutdown, is still in place
RA/BD: Run GFAL unit tests against CASTOR. Get them here: https://gitlab.cern.ch/dmc/gfal2/tree/develop/test/
GP: Turn CASTOR SRMs & other Aquilonised nodes from clients to servers
GP/RA to chase up Fabric team about getting action on RT197296(use fdscspr05 as the preprod stager - replacement for ccse08)
Staffing
GP out until 15th January
RA on call