RAL Tier1 weekly operations Grid 20120326

From GridPP Wiki
Revision as of 10:23, 26 March 2012 by Andrew lahiff (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Alastair

Andrew

  • Upgraded some FTS RPMs; sorting out various FTS issues [Done]
  • Setting up VM FTS web servive hosts using ncm-yaim, updating documentation, change-control request [Almost done]
  • Preparing for MyProxy migration to VM/UMD [Done]
  • Updates to disk/tape SM TEG document [Done]
  • CMS reprocessing [Ongoing]
  • Will be at Imperial on Thursday for a CMS meeting

Catalin

  • EMI install lcgwms02 [hold]
  • snoplus 'production' role issue [done]
  • EMI LFC ready to deploy [ongoing]
  • looking into EMI CREAMCE deployment

Orlin

  • Create documentation for ARGUS EMI Server installation and administration. [done]
  • Create, deploy & test Worker Node EMI/UMD template on virtual machines lcgvm-wn07, lcgvm-wn08. [ongoing]
  • Implement Torque/PBS, gLExec - Argus/SCAS authentication for EMI WN. [ongoing]

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: Catalin (Mon-Sun)