RAL Tier1 weekly operations Grid 20111107

From GridPP Wiki
Revision as of 11:02, 7 November 2011 by Catalin condurache (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Alastair

Andrew

  • October accounting [Done]
  • Updated to capacity planning system, various meetings [Done]
  • Added 2 new FTS channels for ATLAS UCL-HEP [Done]
  • Trying to get access to WMAgent webpages [Ongoing]
  • Dealing with setting up new VO SNO+ [Ongoing]
  • EMI/UMD [Ongoing]

Catalin

  • LHC CREAM-CE access re-configuration [done]
  • lcgce06 drain + decommission [done]
  • work on EMI/UMD BDII deployments [ongoing]
  • deploy first UMD site-BDII [ongoing]
  • HEPSYSMAN QMUL (Thu 10 Nov)

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: Catalin (Mon-Sun)
  • Grid OnCall: