RAL Tier1 weekly operations Grid 20111010

From GridPP Wiki
Revision as of 15:00, 10 October 2011 by Catalin condurache (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status
lcgce08 problems 5 Oct 2011 11:00 6 Oct 2011 19:00 LHCb, ATLAS High mismatch between renewed host cert and old CA release; new CA v1.42 updated

Downtimes

Description Hosts Type Start End Affected VO(s)
glite CREAM upgrade lcgce09 Thu 13 Oct 2011 15:00 Thu 20 Oct 2011 15:00 all LHC
mysql maintenance lcgwms02 Thu 13 Oct 2011 16:00 Thu 20 Oct 2011 15:00 LHC VOs

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Alastair

  • Shift work on Wednesday + Thursday
  • Will apply permission change on Tuesday assuming no problems
  • Rolling out CVMFS across UK Cloud
  • Cleaning up dark data on tape + disk

Andrew

  • Working on EMI APEL, MyProxy, UI [Ongoing]
  • WN glite update 29 - making sure things are ok when installed from scratch [Done]
  • September accounting [Done]
  • Modifications to tape capacity stuff now that ATLAS is using both A and C [Ongoing]

Catalin

  • glite top-BDII updates [done]
  • plan CREAM-CE update (lcgce09) [ongoing]
  • plan LCG-CE06 decommissioning [ongoing]
  • WMS02 maintenance

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: Catalin (Mon-Sun)
  • Grid OnCall: