RAL Tier1 weekly operations Grid 20110404
From GridPP Wiki
Revision as of 14:48, 12 April 2011 by Alastair dewhurst (Talk | contribs)
Contents
Operational Issues
Description | Start | End | Affected VO(s) | Severity | Status |
---|
Downtimes
Description | Hosts | Type | Start | End | Affected VO(s) |
---|
Blocking Issues
Description | Requested Date | Required By Date | Priority | Status |
---|---|---|---|---|
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Alastair
- Away at conference
Andrew
- Installed/configured PhEDEx on a VM, tested using debug PhEDEx instance; tested 2.10 SRM [Done]
- March accounting [Done]
- Tried CASTOR 2.1.10 client on a VM due to issues with 2.1.9 client [Done]
- FTS re-configuration for Finnish Tier2 name change [Done]
- Listening to talks at CMS O&C week (this week)
- CMS data ops
- MC rereco at IN2P3 (long running jobs; use of too much scratch space), FNAL (dealing with duplicate processing jobs)
- APR [To do]
Catalin
- take over BDII responsibilities
- start work on APR
- involved with CREAM CEs installation and configuration [ongoing]
- work on quattorised ATLAS Frontier installation [ongoing]
- GridPP 26 - Brighton (Tue - Wed) [done]
Derek
- Investigating BLParser isssues on lcgce09 [done]
- Syncing with QWG templates [ongoing]
- Improving config of small vos in quattor [ongoing]
- Deploying test quattorised WMS [ongoing]
- GridPP Mon-Wed [done]
- APR
- Proposed decommission of lcgce02 on 4th Apr to H1
Matt
- Produce list of monitoring and other links. [New]
- Web interface to callout response docs. [New]
- Deploy testbed LFC and MyProxy. [Ongoing]
- Add management of FTS groups to SVN config. [Done]
- Contact legacy NFS users. [Ongoing]
VO Reports
ALICE
ATLAS
CMS
- Reprocessing plans: 13th April data re-reco; 27th April MC re-reco; 9th May data re-reco
LHCb
OnCall/AoD Cover
- Primary OnCall: Catalin (Mon-Tue)
- Grid OnCall: Derek (Wed-Sun)
- AoD: