RAL Tier1 weekly operations Grid 20100920

From GridPP Wiki
Revision as of 14:40, 20 September 2010 by Alastair dewhurst (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status
Job status monitoring from CREAMCE 2-Feb-2010 CMS medium [10-Feb-2010] WMS patch available soon; CREAMCE new version available soon [07-Apr-2010] CMS tests have shown that WMS patches resolve the problem; still waiting for patch to be installed on the production WMSs in Italy [13-Jul-2010] CNAF WMSs have been updated; testing using backfill is in progress [19-Jul-2010] So far everything looks good

Downtimes

Description Hosts Type Start End Affected VO(s)
gLite-WMS update + maintenance lcgwms02 Thu 9 Sep 15:00 Thu 16 Sep 15:00 LHC

Blocking Issues

Description Requested Date Required By Date Priority Status
HW needed to test Dataguard technology for LFC/FTS 19 May 2010 15 June 2010 Medium [24-05-2010]HW available; needs to be deployed by Fabric and then handed over to Dataservices

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Alastair

  • Investigated unavailable files on gdss81.
  • Testing gdss5xx series disk server for deployment into production.
  • Working on ATLAS software server, testing CVMFS
    • 825 test jobs have been run.
    • lcg0805 has been setup for production style testing, need to add queue into ATLAS system.
  • Writing script to graph transfer times for FTS transfers
  • Working on Hammer cloud test of castor 2.1.9
    • Analysis queue setup
    • Need to copy DBrelease into pre-prod and replicate

Andrew

  • CMS CASTOR 2.1.9 testing
    • Transfers from RAL to Imperial using gridftp internal [Ongoing]
    • cmsFarmRead stress testing with xroot [Ongoing]
  • Tested PhEDEx on lcgvo-s3-02
  • VO Support Survey
    • Preparing presentation for Monday 4pm meeting
  • Updated ganglia job high time resolution CPU efficiency plots [Done]
  • glite-APEL [Ongoing]

Catalin

  • add new frontends to non-LHC LFC alias [done]
  • add new frontends to LHCb LFC alias [done]
  • gLite updates WMS01 LHC [done]
  • gLite updates WMS02 LHC [ongoing]
  • improve WMS monitoring [ongoing]
  • add new frontends to Atlas LFC alias
  • work on improving ganglia monitoring for Grid Services [ongoing]
  • work on Helpdesk MySQL database migration [ongoing]

Derek

  • Catching up
  • CREAM CE quattor profile [ongoing]
  • Investigating CREAM CE instability [ongoing]
  • Deployed quattorised sudo config
  • Refactored quattorised atlasbackup configuration
  • Intervened on lcgce01 over weekend(11-12) to resolve job submission issue

Matt

  • Further testing of Quattorised FTS FEs. [Ongoing]
  • Rework FTS change control; factor out ATLAS power off. [Ongoing]
  • Quattorisation of MyProxy nodes (write up Change Control). [Ongoing]
  • Develop Ganglia service metrics [Done]
  • Capacity Tracking plan/meeting [Done]

Richard

  • Preparing an update to RAL top-level BDIIs to avoid file space problems
  • Adding a Nagios check for # of entries in BDII servers
  • Working on the "team status page" being developed as an action from team awayday [ongoing]
  • Reviewing G/S process documentation [ongoing]
  • CASTOR items:
    • Helped Cheney with quattor issues building head nodes for facilities instance

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: Catalin (Fri-Sun)
  • Grid OnCall: Derek (Mon-Thu)