RAL Tier1 weekly operations Fabric 20101129

From GridPP Wiki
Revision as of 15:48, 29 November 2010 by James adams (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Developments

  • All:
  • Martin:
  • Ian:
    • Project plan for preprod Quattorised SRMs
    • Plans with LHCb for cvmfs tests
    • Ongoing virtualisation
    • Job plan reviews
  • Tim:
  • Jonathan:
  • James A:
    • Experimented with OpenVPN access to management network.
    • Rewrote part of ncm-download and extended it to support minimum file age.
    • Worked on CASTOR facilities Quattor templates.
  • James T
  • Cheney
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Decommissioning old batch systems.(R 27)
    • gdss380 still with Streamline for fix.(Crashed with single faulty drive)
    • gdss417 acceptance testing. (Crashed with single faulty drive)
    • gdss280 crashed again with replacement raid card borrowed from gdss338. (Testing)
    • gdss117 failed during test. (Probably raid card)
    • Hardware failure stats/graphs.
    • Streamline/areca disk servers crashed due to single faulty drive. (ongoing)
    • 4 days linux course (Tuesday - Friday)


Operational Issues and Incidents

Index Description Start End Severity Affected VO(s)

Summary of plans for week ahead

Scheduled and Cancelled Down Times

Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB

Component Description Start End Affected VO(s) Type

Development priorities

  • All
  • Martin:
  • Ian:
    • Project plan for preprod Quattorised SRMs
    • Public wiki page for cvmfs testing/setup
    • Test lates version of cvmfs
    • Ongoing virtualisation testing
    • Job plan reviews
  • Tim:
  • Cheney
  • Jonathan:
  • James T:
  • James A:
    • Work on CASTOR facilities upgrade with Chris.
    • Prepare zipwire for grid map file use and work on generation mechanism.
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Continuous decommissioning old batch systems.(R 27)

Absences

  • Jonathan on partial retirement (not in on Monday and Friday)
  • Cheney - changed date for being off - now Nov 24th - early warning -likely to be off most of december - date subject to change -

Fabric On-Call

  • Ian Collier

Advanced Warning of Requirements and Blocking issues

Services Issues


RAL Tier1 weekly operations fabric

Category:RAL_Tier1