RAL Tier1 weekly Operations Grid 20130729

From GridPP Wiki
Revision as of 14:50, 29 July 2013 by Catalin condurache (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • 2 FTS3 upgrades; setting up & testing 2 hot standby servers
    • Setup test condor pool + CMS CRAB job submission for physical/VM WN testing
    • Rebuilt torque
    • Built & setup SLURM 2.6.0
    • CMS processing
  • Coming week:
    • Prepare HTCondor security presentation & batch system presentation
    • ARC CE / CREAM CE / HTCondor
    • Setup more workflows for physical/VM WN testing
    • Testing SLURM 2.6.0
    • CMS processing

Catalin

  • Last week
  • This week

Ian

  • Last week:
  • Coming week:

James

  • Last Week
  • This Week

Orlin

  • Last Week
  • This Week

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary On-Call: Catalin (Mon=Sun)

Absences