RAL Tier1 weekly Operations Grid 20130408

From GridPP Wiki
Revision as of 08:43, 8 April 2013 by Andrew lahiff (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • APR
    • Wrote & submitted change controls for CASTOR client upgrades; batch system testing
    • Completed EMI-2 FTS 2.2.9 verication + staged-rollout [Done]
    • EMI-3 UI staged-rollout [Ongoing]
    • Quick install/configure/test of an ARC CE
    • GridPP Cloud + HLT cloud
    • CMS processing
    • Listened to CMS computing evolution workshop
  • Coming week:
    • EMI-3 UI staged-rollout; prepare Quattor template for deploy at RAL
    • Complete March accounting
    • CMS processing

Catalin

  • Last week
  • This week

Ian

  • Last week:
  • Coming week:

James

  • Last Week
  • This Week

Orlin

  • Last Week
  • This Week

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: Catalin (Mon-Sun)

Absences

Ian: Mon-Fri ISGC