RAL Tier1 weekly Operations Grid 20121203
From GridPP Wiki
Revision as of 13:39, 5 December 2012 by Ian collier (Talk | contribs)
Contents
Operational Issues
Description | Start | End | Affected VO(s) | Severity | Status |
---|---|---|---|---|---|
Downtimes
Description | Hosts | Type | Start | End | Affected VO(s) |
---|---|---|---|---|---|
Blocking Issues
Description | Requested Date | Required By Date | Priority | Status |
---|---|---|---|---|
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Andrew
- Last week:
- Prepared for Capacity Signoff meeting
- Wrote CMS presentation for GridPP Cloud meeting
- lcgui02 upgrade to EMI-2
- FTS3 config tidying up
- CMS processing
- Coming week:
- November accounting
- Prepare for Resource Review meeting
- Help Brian with ATLAS FTS3 presentation
- CMS processing
Catalin
- Last week
- This week
Ian
- Last week:
- Coming week:
James
- Last Week
- This Week
Orlin
- Upgrade WNs to SL5 EMI2 [ongoing]
- Learn more about Frontier services and install test lcgvo01/02 frontiers following Alastair's wikipage [ongoing]
- Check which services are logging to syslog & export the logs to central server [done]
- Assign some production WNs to authenticate with EMI2/SL6 Argus Server [to do]
- Prepare & Submit change-control for EMI2/SL6 Argus Server [to do]
- Test High Availability & failover for Argus server with Corosync/RGManager/CMAN [to do]
- Bring back the Testbed back in order, check the list of services [to do]
- Quattorise, Install & Test EMI2/SL6 WNs on the gridTetst queue [to do]
- Test a possibility of EMI2/SL6 WN - preinstalled cloud image with a batch-client [to do]
- Test and compare jobs running on cloud/hypervisor with physical hardware [to do]
- Test & implement Extra monitoring tools for CREAMCEs (if necessary) [to do]
- Grid certificates and elastic FTS [to think about]
VO Reports
ALICE
ATLAS
CMS
LHCb
OnCall/AoD Cover
- Primary OnCall: Ian (Mon-Sun)
- Grid OnCall: Andrew (Mon-Sun)
Absences
Ian: Annual Leave Friiday
Catalin: ITIL Course Mon-Wed