Difference between revisions of "RAL Tier1 Experiments Liaison Meeting"

From GridPP Wiki
Jump to: navigation, search
(Open Actions)
Line 30: Line 30:
 
! Action ID !! Priority !! Experiment(s) !! Owner !! Action !! Status
 
! Action ID !! Priority !! Experiment(s) !! Owner !! Action !! Status
 
|-
 
|-
| 20170425-01-01 || Normal || N/A || Production Team || Imporve handling (especially closing) of GGUS tickets. Notably attempt to reproduce the problem. This can then produce a way to see the symptoms and show it works on closure (solving). || Ongoing
+
| 20170425-01-01 || Normal || N/A || Production Team || Improve handling of GGUS tickets. Notably attempt to reproduce the problem. This can then both produce a way for us to see the symptoms and show it works on closure (solving) - rather than asking the VO if it is fixed. || Ongoing
 
|-
 
|-
| 20170425-01-03 || Normal || N/A || Gareth || Pull together documentation on how to set-up a new VO on teh Tier1. With teh aim of making this process more streamlined and being able to be done by someone from Production Tema rather than needing the 'expert'. || Ongoing
+
| 20170425-01-03 || Normal || N/A || Gareth || Pull together documentation on how to set-up a new VO on the Tier1. With the aim of making this process more streamlined and being able to be done by someone from Production Tema rather than needing the 'expert'. || Ongoing
 
|}
 
|}
 
  
 
== Completed Actions ==
 
== Completed Actions ==

Revision as of 12:20, 2 May 2018


Covers all aspects of the Tier1. Meeting access information is available from Indico. Previous special presentations can be found here.

Agenda

Chairman: Darren Moore/Alistair Dewhurst

Secretary: Gareth Smith; Darren Moore

  1. Major Incidents/Changes
  2. Experiment operational issues
    • GGUS#RT Tickets
    • VO's present
    • Others methods
  3. Experiment planning
  4. Continual improvement of T1 procedures
    • Responding to tickets
  5. AoB

Open Actions

Action ID Priority Experiment(s) Owner Action Status
20170425-01-01 Normal N/A Production Team Improve handling of GGUS tickets. Notably attempt to reproduce the problem. This can then both produce a way for us to see the symptoms and show it works on closure (solving) - rather than asking the VO if it is fixed. Ongoing
20170425-01-03 Normal N/A Gareth Pull together documentation on how to set-up a new VO on the Tier1. With the aim of making this process more streamlined and being able to be done by someone from Production Tema rather than needing the 'expert'. Ongoing

Completed Actions

Action ID Priority Experiment(s) Owner Action Status Completed date
20171101-01 Normal N/A Martin and Gareth GS and MB to discuss replacing Andrew.L for secretarial and tech duties Done 2018-01-03
20180314-01 Normal N/A Brian Davies Circulate among the Tier1 team the way to identify the IPv6 configuration problem that was seen on FTS nodes. Done 2018-03-28

Archives of actions completed can be found at: