(Open Actions)
(Open Actions)
Line 34: Line 34:
 
| 201870425-01-03 || Normal || N/A || Gareth || Pull together documentation on how to set-up a new VO on the Tier1. With the aim of making this process more streamlined and being able to be done by someone from Production Team rather than needing the 'expert'. || Ongoing
 
| 201870425-01-03 || Normal || N/A || Gareth || Pull together documentation on how to set-up a new VO on the Tier1. With the aim of making this process more streamlined and being able to be done by someone from Production Team rather than needing the 'expert'. || Ongoing
 
|-
 
|-
| 201870525-01-01 || Normal || N/A || Production Team || Improve handling of GGUS tickets. Notably attempt to reproduce the problem. This can then both produce a way for us to see the symptoms and show it works on closure (solving) - rather than asking the VO if it is fixed. || Ongoing
+
| 20180905-01 || Normal || N/A || Raja || Raja to ask DUNE to provide specific requirements for their data needs. || New
 
|-
 
|-
 +
| 20180905-02 || Normal || N/A || Brian|| Brian to chase Tier2's (that SKA are using), for incorrectly configured WebDAV || New
 +
|-
 +
| 20180905-03 || Normal || N/A || Alistair || Alistair to write up results of the Rucio workshop || New
 +
|-
 +
| 20180905-04 || Normal || N/A || Catalin || Catalin to setup 2WN's (128Gb memory), to be reserved for SKA testing || New
 +
|
 
|}
 
|}
  

Revision as of 13:15, 9 May 2018


Covers all aspects of the Tier1. Meeting access information is available from Indico. Previous special presentations can be found here.

Agenda

Chairman: Darren Moore/Alistair Dewhurst

Secretary: Gareth Smith; Darren Moore

  1. Major Incidents/Changes
  2. Experiment operational issues
    • GGUS#RT Tickets
    • VO's present
    • Others methods
  3. Experiment planning
  4. Continual improvement of T1 procedures
    • Responding to tickets
  5. AoB

Open Actions

Action ID Priority Experiment(s) Owner Action Status
20180425-01-01 Normal N/A Production Team Improve handling of GGUS tickets. Notably attempt to reproduce the problem. This can then both produce a way for us to see the symptoms and show it works on closure (solving) - rather than asking the VO if it is fixed. Ongoing
201870425-01-03 Normal N/A Gareth Pull together documentation on how to set-up a new VO on the Tier1. With the aim of making this process more streamlined and being able to be done by someone from Production Team rather than needing the 'expert'. Ongoing
20180905-01 Normal N/A Raja Raja to ask DUNE to provide specific requirements for their data needs. New
20180905-02 Normal N/A Brian Brian to chase Tier2's (that SKA are using), for incorrectly configured WebDAV New
20180905-03 Normal N/A Alistair Alistair to write up results of the Rucio workshop New
20180905-04 Normal N/A Catalin Catalin to setup 2WN's (128Gb memory), to be reserved for SKA testing New

Completed Actions

Action ID Priority Experiment(s) Owner Action Status Completed date
20171101-01 Normal N/A Martin and Gareth GS and MB to discuss replacing Andrew.L for secretarial and tech duties Done 2018-01-03
20180314-01 Normal N/A Brian Davies Circulate among the Tier1 team the way to identify the IPv6 configuration problem that was seen on FTS nodes. Done 2018-03-28

Archives of actions completed can be found at: