Production Team Report 2009-12-07

From GridPP Wiki
Revision as of 12:05, 7 December 2009 by Gareth smith (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

RAL Tier1 Production Team Report for 7th December 2009.

AoD This Week

Mon-Tue: John Wed-Thu: Ian Fri: John

Last Week

  • All: Nuking Hard Disks on old worker nodes, Review of AoD check list.
  • Gareth: Preparation for GridPP review, Change Control issues.
  • John: Updates to method of downloading CRLs (built rpm ready for test), Investigated tracing batch jobs, BIO & Atlas jobs failing, and puppet issues, Wiki extract.
  • Tiju: AoD(4 days), minor revisions to dashboard, updated elog config

Changes to Operating procedures

  • Change Management Process.

Declared Outages in GOC DB

  • None