Perfsonar refresh

From GridPP Wiki
Revision as of 12:32, 30 September 2020 by Duncan Rand 075e847bbc (Talk | contribs)

Jump to: navigation, search


Site Status Notes Date last reviewed or updated


RAL Tier-1 In progress Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment. 2020-05-29


UKI-LT2-Brunel In progress Server in rack 2020-09-30


UKI-LT2-IC-HEP Done Server racked in the machine room. 2020-05-29


UKI-LT2-QMUL In progress New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.

As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us.

2020-05-29
UKI-LT2-RHUL In progress New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) 2020-05-29
UKI-LT2-UCL-HEP In progress 2020-09-30
UKI-NORTHGRID-LANCS-HEP In progress 2020-09-30
UKI-NORTHGRID-LIV-HEP In progress 2020-09-30
UKI-NORTHGRID-MAN-HEP In progress 2020-09-30


UKI-NORTHGRID-SHEF-HEP In progress 2020-09-30
UKI-SCOTGRID-DURHAM In progress 2020-09-30
UKI-SCOTGRID-ECDF In progress 2020-09-30
UKI-SCOTGRID-GLASGOW In progress 2020-09-30
UKI-SOUTHGRID-BHAM-HEP In progress 2020-09-30
UKI-SOUTHGRID-BRIS In progress Building still closed, new Perfsonar hardware still with delivery/vendor 2020-05-29
UKI-SOUTHGRID-CAM-HEP In progress 2020-09-30
UKI-SOUTHGRID-OX-HEP In progress 2020-09-30
UKI-SOUTHGRID-RALPP In progress 2020-09-30
UKI-SOUTHGRID-SUSX In progress 2020-09-30