Deployment

We are installing WLCG nodes and deployment instructions may be found on the OSG Networking pages. In the past large sites had two hosts, one for bandwidth tests and one for latency tests. In this refresh both tests run from one host using two NICs, each with its own FQDN. Details of how to configure this new dual-NIC configuration may be found on the OSG site here and in the official perfSONAR documentation. Please make sure to update the GOCDB if you change the names of the hosts. You can check basic operation of your hosts on the WLCG Check_MK service:

and also the UK dashboard here

With respect to the existing data, the WLCG installation guide states: "Local measurement archive backup is not needed as OSG/WLCG stores all measurements centrally. In case you'd like to perform the backup anyway please follow the migration guide."

Site Status New host names Notes Date last reviewed or updated
RAL Tier-1 In progress Hardware has been installed and cabled up. The 100Gb/s capable switch that it will connect to has not been installed yet. We are working on connecting it at 10Gb/s for now so we can get it working and will upgrade it to 100Gb/s when the switch arrives (~December). 2020-10-02
UKI-LT2-Brunel In progress The perfSONAR server has been delivered but access to the data centre has been restricted. Access to the data centre should be possible by mid October and we hope to have it running soon after. 2020-10-02
UKI-LT2-IC-HEP Done lt2ps00-lat.grid.hep.ph.ic.ac.uk lt2ps00-bw.grid.hep.ph.ic.ac.uk Joined WLCG 100G mesh 2020-09-30
UKI-LT2-QMUL In progress New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.

As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us.

2020-05-29
UKI-LT2-RHUL In progress New node was received and set up in our lab, has now been moved to the data centre and is ready for physical installation, along with some accompanying network equipment. No estimate yet as to when we could do this. (Simon) 2020-09-30
UKI-NORTHGRID-LANCS-HEP In progress The new Lancaster perfsonar box is in the rack and cabled up, but the ports are on the wrong VLAN. Have a long standing ticket with our Networking guys to sort this - but not had much luck getting any networking effort the last few months. Update - networking resolved, box install and configuration underway 2020-10-01
UKI-NORTHGRID-LIV-HEP Done New node installed with perfsonar, running bandwidth and latency tests. Old nodes shut down. Awaiting test results. 2020-10-15
UKI-NORTHGRID-MAN-HEP On hold Hardware ordered, but hasn't arrived yet. Installation also depending on network upgrade. No information by when this will be completed (also dependent on the University getting its 100G connections to JISC). 2020-09-20
UKI-NORTHGRID-SHEF-HEP In progress Sheffield Has installed new box and networking team have opened firewall ports and deal with reverse lookup DNS. The box is configured with bonded interface so may need separating out in the future. For now it is "working" attention needs to be elsewhere. 2020-10-05
UKI-SCOTGRID-DURHAM Done They are seeing asymmetric routing, which is being investigated. 2020-05-29
UKI-SCOTGRID-ECDF Done Completed before Covid-19 caused problems. 2020-05-29
UKI-SCOTGRID-GLASGOW Done ps001.gla.scotgrid.ac.uk ps002.gla.scotgrid.ac.uk Hardware installed, highlighted problems with number of paths due to in process DC migration as well as IPv6 bandwidth issues. 2020-09-30
UKI-SOUTHGRID-BHAM-HEP In Progress epgperf.ph.bham.ac.uk Hardware arrived. Now regular access allowed to buildings plan to rack and install in the next month. 2020-10-02
UKI-SOUTHGRID-BRIS In progress new Perfsonar hardware in rack & iDRAC configured, about to load OS-load 2020-10-01
UKI-SOUTHGRID-OX-HEP Done t2ps-bandwidth2.physics.ox.ac.uk t2ps-latency2.physics.ox.ac.uk Completed. 2020-09-30
UKI-SOUTHGRID-RALPP Unknown YYYY-MM-DD
UKI-SOUTHGRID-SUSX Unknown YYYY-MM-DD

Installation Caveats