Difference between revisions of "Perfsonar refresh"
From GridPP Wiki
Line 53: | Line 53: | ||
|The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June. | |The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June. | ||
|2020-05-29 | |2020-05-29 | ||
− | |||
|- | |- | ||
|UKI-NORTHGRID-LIV-HEP | |UKI-NORTHGRID-LIV-HEP | ||
Line 60: | Line 59: | ||
| | | | ||
|YYYY-MM-DD | |YYYY-MM-DD | ||
− | |||
|- | |- | ||
|UKI-NORTHGRID-MAN-HEP | |UKI-NORTHGRID-MAN-HEP | ||
Line 67: | Line 65: | ||
| | | | ||
|YYYY-MM-DD | |YYYY-MM-DD | ||
− | |||
− | |||
|- | |- | ||
|UKI-NORTHGRID-SHEF-HEP | |UKI-NORTHGRID-SHEF-HEP | ||
Line 82: | Line 78: | ||
|2020-05-29 | |2020-05-29 | ||
|- | |- | ||
− | |||
|UKI-SCOTGRID-ECDF | |UKI-SCOTGRID-ECDF | ||
|<span style="color:green">Done</span> | |<span style="color:green">Done</span> | ||
Line 88: | Line 83: | ||
|Completed before Covid-19 caused problems. | |Completed before Covid-19 caused problems. | ||
|2020-05-29 | |2020-05-29 | ||
− | |||
|- | |- | ||
|UKI-SCOTGRID-GLASGOW | |UKI-SCOTGRID-GLASGOW | ||
Line 95: | Line 89: | ||
|Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status. | |Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status. | ||
|2020-05-29 | |2020-05-29 | ||
− | |||
|- | |- | ||
|UKI-SOUTHGRID-BHAM-HEP | |UKI-SOUTHGRID-BHAM-HEP | ||
Line 102: | Line 95: | ||
| | | | ||
|YYYY-MM-DD | |YYYY-MM-DD | ||
− | |||
|- | |- | ||
|UKI-SOUTHGRID-BRIS | |UKI-SOUTHGRID-BRIS | ||
Line 109: | Line 101: | ||
|Building still closed, new Perfsonar hardware still with delivery/vendor | |Building still closed, new Perfsonar hardware still with delivery/vendor | ||
|2020-05-29 | |2020-05-29 | ||
− | |||
|- | |- | ||
|UKI-SOUTHGRID-CAM-HEP | |UKI-SOUTHGRID-CAM-HEP | ||
Line 116: | Line 107: | ||
| | | | ||
|YYYY-MM-DD | |YYYY-MM-DD | ||
− | |||
|- | |- | ||
|UKI-SOUTHGRID-OX-HEP | |UKI-SOUTHGRID-OX-HEP | ||
Line 129: | Line 119: | ||
| | | | ||
|YYYY-MM-DD | |YYYY-MM-DD | ||
− | |||
|- | |- | ||
|UKI-SOUTHGRID-SUSX | |UKI-SOUTHGRID-SUSX | ||
Line 136: | Line 125: | ||
| | | | ||
|YYYY-MM-DD | |YYYY-MM-DD | ||
− | |||
|} | |} | ||
Revision as of 12:52, 30 September 2020
Site | Status | Host names | Notes | Date last reviewed or updated |
RAL Tier-1 | In progress | Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment. | 2020-05-29 | |
UKI-LT2-Brunel | In progress | We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown. | 2020-05-29 | |
UKI-LT2-IC-HEP | Done | lt2ps00-lat.grid.hep.ph.ic.ac.uk lt2ps00-bw.grid.hep.ph.ic.ac.uk | Joined WLCG 100G mesh | 2020-09-30 |
UKI-LT2-QMUL | In progress | New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.
As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us. |
2020-05-29 | |
UKI-LT2-RHUL | In progress | New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) | 2020-05-29 | |
UKI-LT2-UCL-HEP | In progress | YYYY-MM-DD | ||
UKI-NORTHGRID-LANCS-HEP | In progress | The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June. | 2020-05-29 | |
UKI-NORTHGRID-LIV-HEP | In progress | YYYY-MM-DD | ||
UKI-NORTHGRID-MAN-HEP | In progress | YYYY-MM-DD | ||
UKI-NORTHGRID-SHEF-HEP | In progress | YYYY-MM-DD | ||
UKI-SCOTGRID-DURHAM | Done | They are seeing asymmetric routing, which is being investigated. | 2020-05-29 | |
UKI-SCOTGRID-ECDF | Done | Completed before Covid-19 caused problems. | 2020-05-29 | |
UKI-SCOTGRID-GLASGOW | In progress | Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status. | 2020-05-29 | |
UKI-SOUTHGRID-BHAM-HEP | In progress | YYYY-MM-DD | ||
UKI-SOUTHGRID-BRIS | In progress | Building still closed, new Perfsonar hardware still with delivery/vendor | 2020-05-29 | |
UKI-SOUTHGRID-CAM-HEP | In progress | YYYY-MM-DD | ||
UKI-SOUTHGRID-OX-HEP | In progress | Managed to rack up the boxes last week. Will try and install them in the coming couple of weeks. | 2020-05-29 | |
UKI-SOUTHGRID-RALPP | In progress | YYYY-MM-DD | ||
UKI-SOUTHGRID-SUSX | In progress | YYYY-MM-DD |