Difference between revisions of "Perfsonar refresh"
From GridPP Wiki
Line 21: | Line 21: | ||
|UKI-LT2-Brunel | |UKI-LT2-Brunel | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
− | |We have received our perfsonar, but we have two problems: | + | |We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown. |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
|2020-05-29 | |2020-05-29 | ||
Line 31: | Line 27: | ||
|- | |- | ||
|UKI-LT2-IC-HEP | |UKI-LT2-IC-HEP | ||
− | |<span style="color: | + | |<span style="color:red">In progress</span> |
| Server racked in the machine room. | | Server racked in the machine room. | ||
|2020-05-29 | |2020-05-29 | ||
Line 54: | Line 50: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|- | |- | ||
Line 66: | Line 62: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|- | |- | ||
Line 72: | Line 68: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
Line 79: | Line 75: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|- | |- | ||
|UKI-SCOTGRID-DURHAM | |UKI-SCOTGRID-DURHAM | ||
Line 102: | Line 98: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|- | |- | ||
Line 114: | Line 110: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|- | |- | ||
Line 125: | Line 121: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|- | |- | ||
Line 131: | Line 127: | ||
|<span style="color:red">In progress</span> | |<span style="color:red">In progress</span> | ||
| | | | ||
− | | | + | |YYYY-MM-DD |
|} | |} |
Revision as of 12:39, 30 September 2020
Site | Status | Notes | Date last reviewed or updated
|
RAL Tier-1 | In progress | Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment. | 2020-05-29
|
UKI-LT2-Brunel | In progress | We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown. | 2020-05-29
|
UKI-LT2-IC-HEP | In progress | Server racked in the machine room. | 2020-05-29
|
UKI-LT2-QMUL | In progress | New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.
As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us. |
2020-05-29 |
UKI-LT2-RHUL | In progress | New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) | 2020-05-29 |
UKI-LT2-UCL-HEP | In progress | YYYY-MM-DD | |
UKI-NORTHGRID-LANCS-HEP | In progress | The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June. | 2020-05-29 |
UKI-NORTHGRID-LIV-HEP | In progress | YYYY-MM-DD | |
UKI-NORTHGRID-MAN-HEP | In progress | YYYY-MM-DD
| |
UKI-NORTHGRID-SHEF-HEP | In progress | YYYY-MM-DD | |
UKI-SCOTGRID-DURHAM | Done | They are seeing asymmetric routing, which is being investigated. | 2020-05-29 |
UKI-SCOTGRID-ECDF | Done | Completed before Covid-19 caused problems. | 2020-05-29 |
UKI-SCOTGRID-GLASGOW | In progress | Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status. | 2020-05-29 |
UKI-SOUTHGRID-BHAM-HEP | In progress | YYYY-MM-DD | |
UKI-SOUTHGRID-BRIS | In progress | Building still closed, new Perfsonar hardware still with delivery/vendor | 2020-05-29 |
UKI-SOUTHGRID-CAM-HEP | In progress | YYYY-MM-DD | |
UKI-SOUTHGRID-OX-HEP | In progress | Managed to rack up the boxes last week. Will try and install them in the coming couple of weeks. | 2020-05-29 |
UKI-SOUTHGRID-RALPP | In progress | YYYY-MM-DD | |
UKI-SOUTHGRID-SUSX | In progress | YYYY-MM-DD |