Difference between revisions of "Perfsonar refresh"

From GridPP Wiki
Jump to: navigation, search
Line 53: Line 53:
 
|The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June.
 
|The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June.
 
|2020-05-29
 
|2020-05-29
 
 
|-
 
|-
 
|UKI-NORTHGRID-LIV-HEP
 
|UKI-NORTHGRID-LIV-HEP
Line 60: Line 59:
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
 
 
|-
 
|-
 
|UKI-NORTHGRID-MAN-HEP
 
|UKI-NORTHGRID-MAN-HEP
Line 67: Line 65:
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
 
 
 
|-
 
|-
 
|UKI-NORTHGRID-SHEF-HEP
 
|UKI-NORTHGRID-SHEF-HEP
Line 82: Line 78:
 
|2020-05-29
 
|2020-05-29
 
|-
 
|-
 
 
|UKI-SCOTGRID-ECDF
 
|UKI-SCOTGRID-ECDF
 
|<span style="color:green">Done</span>
 
|<span style="color:green">Done</span>
Line 88: Line 83:
 
|Completed before Covid-19 caused problems.
 
|Completed before Covid-19 caused problems.
 
|2020-05-29
 
|2020-05-29
 
 
|-
 
|-
 
|UKI-SCOTGRID-GLASGOW
 
|UKI-SCOTGRID-GLASGOW
Line 95: Line 89:
 
|Hardware has been delivered.  Sam didn’t feel qualified to comment on the exact status.   
 
|Hardware has been delivered.  Sam didn’t feel qualified to comment on the exact status.   
 
|2020-05-29
 
|2020-05-29
 
 
|-
 
|-
 
|UKI-SOUTHGRID-BHAM-HEP
 
|UKI-SOUTHGRID-BHAM-HEP
Line 102: Line 95:
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
 
 
|-
 
|-
 
|UKI-SOUTHGRID-BRIS
 
|UKI-SOUTHGRID-BRIS
Line 109: Line 101:
 
|Building still closed, new Perfsonar hardware still with delivery/vendor
 
|Building still closed, new Perfsonar hardware still with delivery/vendor
 
|2020-05-29
 
|2020-05-29
 
 
|-
 
|-
 
|UKI-SOUTHGRID-CAM-HEP
 
|UKI-SOUTHGRID-CAM-HEP
Line 116: Line 107:
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
 
 
|-
 
|-
 
|UKI-SOUTHGRID-OX-HEP
 
|UKI-SOUTHGRID-OX-HEP
Line 129: Line 119:
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
 
 
|-
 
|-
 
|UKI-SOUTHGRID-SUSX
 
|UKI-SOUTHGRID-SUSX
Line 136: Line 125:
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
 
 
|}
 
|}
  

Revision as of 12:52, 30 September 2020


Site Status Host names Notes Date last reviewed or updated
RAL Tier-1 In progress Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment. 2020-05-29
UKI-LT2-Brunel In progress We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown. 2020-05-29
UKI-LT2-IC-HEP Done lt2ps00-lat.grid.hep.ph.ic.ac.uk lt2ps00-bw.grid.hep.ph.ic.ac.uk Joined WLCG 100G mesh 2020-09-30
UKI-LT2-QMUL In progress New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.

As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us.

2020-05-29
UKI-LT2-RHUL In progress New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) 2020-05-29
UKI-LT2-UCL-HEP In progress YYYY-MM-DD
UKI-NORTHGRID-LANCS-HEP In progress The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June. 2020-05-29
UKI-NORTHGRID-LIV-HEP In progress YYYY-MM-DD
UKI-NORTHGRID-MAN-HEP In progress YYYY-MM-DD
UKI-NORTHGRID-SHEF-HEP In progress YYYY-MM-DD
UKI-SCOTGRID-DURHAM Done They are seeing asymmetric routing, which is being investigated. 2020-05-29
UKI-SCOTGRID-ECDF Done Completed before Covid-19 caused problems. 2020-05-29
UKI-SCOTGRID-GLASGOW In progress Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status. 2020-05-29
UKI-SOUTHGRID-BHAM-HEP In progress YYYY-MM-DD
UKI-SOUTHGRID-BRIS In progress Building still closed, new Perfsonar hardware still with delivery/vendor 2020-05-29
UKI-SOUTHGRID-CAM-HEP In progress YYYY-MM-DD
UKI-SOUTHGRID-OX-HEP In progress Managed to rack up the boxes last week. Will try and install them in the coming couple of weeks. 2020-05-29
UKI-SOUTHGRID-RALPP In progress YYYY-MM-DD
UKI-SOUTHGRID-SUSX In progress YYYY-MM-DD