Difference between revisions of "Perfsonar refresh"

From GridPP Wiki
Jump to: navigation, search
Line 7: Line 7:
 
|Site
 
|Site
 
|Status
 
|Status
 +
|Host names
 
|Notes
 
|Notes
 
|Date last reviewed or updated
 
|Date last reviewed or updated
Line 14: Line 15:
 
|RAL  Tier-1
 
|RAL  Tier-1
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|Hardware has been delivered.  Still in boxes as it is not a clear .  Realistic time frame of October for deployment.
 
|Hardware has been delivered.  Still in boxes as it is not a clear .  Realistic time frame of October for deployment.
 
|2020-05-29
 
|2020-05-29
Line 21: Line 23:
 
|UKI-LT2-Brunel
 
|UKI-LT2-Brunel
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown.
 
|We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown.
 
|2020-05-29
 
|2020-05-29
Line 28: Line 31:
 
|UKI-LT2-IC-HEP
 
|UKI-LT2-IC-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|lt2ps00-lat.grid.hep.ph.ic.ac.uk, lt2ps00-bw.grid.hep.ph.ic.ac.uk
 
| Server racked in the machine room.
 
| Server racked in the machine room.
 
|2020-05-29
 
|2020-05-29
Line 35: Line 39:
 
|UKI-LT2-QMUL
 
|UKI-LT2-QMUL
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames.  We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.
 
|New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames.  We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.
  
Line 43: Line 48:
 
|UKI-LT2-RHUL
 
|UKI-LT2-RHUL
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon)
 
|New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon)
 
|2020-05-29
 
|2020-05-29
Line 55: Line 61:
 
|UKI-NORTHGRID-LANCS-HEP
 
|UKI-NORTHGRID-LANCS-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June.
 
|The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June.
 
|2020-05-29
 
|2020-05-29
Line 61: Line 68:
 
|UKI-NORTHGRID-LIV-HEP
 
|UKI-NORTHGRID-LIV-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
Line 67: Line 75:
 
|UKI-NORTHGRID-MAN-HEP
 
|UKI-NORTHGRID-MAN-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
Line 74: Line 83:
 
|UKI-NORTHGRID-SHEF-HEP
 
|UKI-NORTHGRID-SHEF-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
Line 79: Line 89:
 
|UKI-SCOTGRID-DURHAM
 
|UKI-SCOTGRID-DURHAM
 
|<span style="color:green">Done</span>
 
|<span style="color:green">Done</span>
 +
|
 
|They are seeing asymmetric routing, which is being investigated.
 
|They are seeing asymmetric routing, which is being investigated.
 
|2020-05-29
 
|2020-05-29
Line 85: Line 96:
 
|UKI-SCOTGRID-ECDF
 
|UKI-SCOTGRID-ECDF
 
|<span style="color:green">Done</span>
 
|<span style="color:green">Done</span>
 +
|
 
|Completed before Covid-19 caused problems.
 
|Completed before Covid-19 caused problems.
 
|2020-05-29
 
|2020-05-29
Line 91: Line 103:
 
|UKI-SCOTGRID-GLASGOW
 
|UKI-SCOTGRID-GLASGOW
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|Hardware has been delivered.  Sam didn’t feel qualified to comment on the exact status.   
 
|Hardware has been delivered.  Sam didn’t feel qualified to comment on the exact status.   
 
|2020-05-29
 
|2020-05-29
Line 97: Line 110:
 
|UKI-SOUTHGRID-BHAM-HEP
 
|UKI-SOUTHGRID-BHAM-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
Line 103: Line 117:
 
|UKI-SOUTHGRID-BRIS
 
|UKI-SOUTHGRID-BRIS
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|Building still closed, new Perfsonar hardware still with delivery/vendor
 
|Building still closed, new Perfsonar hardware still with delivery/vendor
 
|2020-05-29
 
|2020-05-29
Line 109: Line 124:
 
|UKI-SOUTHGRID-CAM-HEP
 
|UKI-SOUTHGRID-CAM-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD
Line 115: Line 131:
 
|UKI-SOUTHGRID-OX-HEP
 
|UKI-SOUTHGRID-OX-HEP
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|Managed to rack up the boxes last week.  Will try and install them in the coming couple of weeks.
 
|Managed to rack up the boxes last week.  Will try and install them in the coming couple of weeks.
 
|2020-05-29
 
|2020-05-29
Line 126: Line 143:
 
|UKI-SOUTHGRID-SUSX
 
|UKI-SOUTHGRID-SUSX
 
|<span style="color:red">In progress</span>
 
|<span style="color:red">In progress</span>
 +
|
 
|
 
|
 
|YYYY-MM-DD
 
|YYYY-MM-DD

Revision as of 12:45, 30 September 2020


Site Status Host names Notes Date last reviewed or updated


RAL Tier-1 In progress Hardware has been delivered. Still in boxes as it is not a clear . Realistic time frame of October for deployment. 2020-05-29


UKI-LT2-Brunel In progress We have received our perfsonar, but we have two problems: 1) restrictions on access to racks, due to COVID limitations, 2) restrictions due to network upgrade that should have been done before the lockdown. 2020-05-29


UKI-LT2-IC-HEP In progress lt2ps00-lat.grid.hep.ph.ic.ac.uk, lt2ps00-bw.grid.hep.ph.ic.ac.uk Server racked in the machine room. 2020-05-29


UKI-LT2-QMUL In progress New 100Gb-capable perfSONAR hardware has been deployed into rack, connected to 100Gb switch and has IPv4/IPv6 connectivity w/ jumbo frames. We would like to migrate the PMA (perfSONAR Measurement Archive) from our existing perfSONAR hosts but if this is not necessary, we don’t have a problem in simply changing our DNS records to point to the new host and consider the PMA on the existing hosts as ‘lost’.

As the existing hosts require physical access in order to gain shell access, migrating the data is somewhat difficult as our Mile End campus is still under lockdown with limited access available to us.

2020-05-29
UKI-LT2-RHUL In progress New node is installed but sitting in a temporary rack in our dept, awaiting the resumption of the portering service to move it to the data centre. (Simon) 2020-05-29
UKI-LT2-UCL-HEP In progress YYYY-MM-DD
UKI-NORTHGRID-LANCS-HEP In progress The new Lancaster perfsonar box is in the rack and I hope to have it installed and configured soon, but it's having to take a back seat for a big cluster overhaul happening towards the end of June. I will be online by the end of June, but probably not until right near the end of June. 2020-05-29
UKI-NORTHGRID-LIV-HEP In progress YYYY-MM-DD
UKI-NORTHGRID-MAN-HEP In progress YYYY-MM-DD


UKI-NORTHGRID-SHEF-HEP In progress YYYY-MM-DD
UKI-SCOTGRID-DURHAM Done They are seeing asymmetric routing, which is being investigated. 2020-05-29
UKI-SCOTGRID-ECDF Done Completed before Covid-19 caused problems. 2020-05-29
UKI-SCOTGRID-GLASGOW In progress Hardware has been delivered. Sam didn’t feel qualified to comment on the exact status. 2020-05-29
UKI-SOUTHGRID-BHAM-HEP In progress YYYY-MM-DD
UKI-SOUTHGRID-BRIS In progress Building still closed, new Perfsonar hardware still with delivery/vendor 2020-05-29
UKI-SOUTHGRID-CAM-HEP In progress YYYY-MM-DD
UKI-SOUTHGRID-OX-HEP In progress Managed to rack up the boxes last week. Will try and install them in the coming couple of weeks. 2020-05-29
UKI-SOUTHGRID-RALPP In progress YYYY-MM-DD
UKI-SOUTHGRID-SUSX In progress YYYY-MM-DD